Revision history of "Umbrella design, micro-installations of RES in the Municipality of Sokołów Małopolska" (Q118501)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 63,851 bytes +16 Changed label, description and/or aliases in pt
  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 63,835 bytes +34 Set a claim value: summary (P836): O principal objetivo do projeto é obter capacidade adicional para produzir eletricidade e calor a partir de fontes renováveis. Para atingir este objectivo, prevê-se: Aquisição de instalações fotovoltaicas, instalações solares com reservatórios de água quente e caldeiras a biomassa, ou seja, 510 instalações de painéis fotovoltaicos, incluindo: 10 unidades com uma potência de 2,7 kW, 458 unidades com uma potência de 3,24, kW e 42 pcs com uma capacidad...

12 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 60,627 bytes −1,254 Changed label, description and/or aliases in sk, lv, it, da, fi, sv, de, fr, bg, et, el, sl, pt, ro, cs, ga, hu, nl, hr, mt, es, lt, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3514:35, 27 July 2022DG Regio talk contribs 59,755 bytes +37,421 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,251 bytes +2,024 Created claim: summary (P836): L’objectif principal du projet est d’obtenir des capacités supplémentaires pour produire de l’électricité et de la chaleur à partir de sources renouvelables. Pour atteindre cet objectif, il est prévu de: achat d’installations photovoltaïques, d’installations solaires dotées de réservoirs de stockage d’eau chaude et de chaudières à biomasse, c’est-à-dire: 510 installations de panneaux photovoltaïques, y compris: 10 pièces d’une puissance de 2,7 k...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,227 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,534 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,387 bytes −150 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,537 bytes +1,827 Created claim: summary (P836): The main objective of the project is to obtain additional capacity to generate electricity and heat from renewable sources. In order to meet this objective, it is planned to: purchase of photovoltaic installations, solar installations with hot water storage tanks and biomass boilers, i.e.:510 installations of photovoltaic panels, including: 10 units with a power of 2.7 kW, 458 units with a power of 3,24, kW and 42 pcs with a capacity of 4,59 kW....
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 10,710 bytes −1,404 Removed claim: summary (P836): The main objective of the project is to obtain an additional capacity to generate electricity and heat from renewable sources. To meet this objective it is planned to: purchase of photovoltaic installations, solar hot water storage installations and biomass boilers, i.e. 510 solar panels installations, including: 10 units with a power of 2.7 kW, 458 units with a power of 3,24, kW and 42 units, with a power of 4.59 kW. 60 biomass boilers, inclu...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 10,830 bytes +1,404 Created claim: summary (P836): The main objective of the project is to obtain an additional capacity to generate electricity and heat from renewable sources. To meet this objective it is planned to: purchase of photovoltaic installations, solar hot water storage installations and biomass boilers, i.e. 510 solar panels installations, including: 10 units with a power of 2.7 kW, 458 units with a power of 3,24, kW and 42 units, with a power of 4.59 kW. 60 biomass boilers, includi...

24 February 2020

18 February 2020

31 January 2020

14 January 2020