Revision history of "Support for distributed energy in Bieszczady Municipalities through the installation of renewable energy systems for households." (Q118500)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 94,163 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 94,165 bytes +31 Set a claim value: summary (P836): Projeto «parasol» executado em parceria (Leader-Gmina Ustrzyki Dolne, Partners: O município de Czarna, Olszanica, Solina, Cisna) diz respeito à construção de unidades de produção de energia a partir de FER: conjuntos fotovoltaicos (2,04 a 5,10 kW), instalações solares (2,86 a 4,29 kW), caldeiras a biomassa (com uma potência de 15 a 45 kW cada), bombas de calor (com uma potência de 6 a 13 kW), injeções Painéis fotovoltaicos 144 unidades, sistemas sol...

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 90,960 bytes −12 Changed label, description and/or aliases in lv, it, ro, da, sv, fr, ga, bg, sk, de, hu, fi, et, mt, sl, nl, el, hr, es, lt, cs, pt, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3414:34, 27 July 2022DG Regio talk contribs 87,648 bytes +57,590 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 17,655 bytes +3,177 Created claim: summary (P836): Projet «umbrella» mis en œuvre en partenariat (Lider-Gmina Ustrzyki Dolne, Partenaires: Commune de Czarna, Olszanica, Solina, Cisna) concerne la construction d’unités productrices de SER: kits photovoltaïques (2,04 à 5,10 kW), systèmes solaires (2,86 à 4,29 kW), chaudières à biomasse (de 15 à 45 kW chacune), pompes à chaleur (6 à 13 kW), Ustrzyki Dolne: panneaux photovoltaïques 144 pcs., installations solaires 56 pcs., pompes à chaleur 21 pcs.,...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,478 bytes +208 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 14,709 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 14,521 bytes −197 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 14,718 bytes +2,787 Created claim: summary (P836): “parasol” project implemented in partnership (Leader-Gmina Ustrzyki Dolne, Partners: The Municipality of Czarna, Olszanica, Solina, Cisna) concerns the construction of energy generation units from RES: photovoltaic sets (2.04 to 5.10 kW), solar installations (2.86 to 4.29 kW), biomass boilers (with a power of 15 to 45 kW each), heat pumps (with a power from 6 to 13 kW), in Injections Lower: photovoltaic panels 144 units, solar systems 56 pcs, he...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 11,931 bytes −2,316 Removed claim: summary (P836): Partnership project implemented in partnership (Lider-Lmin Ustryki Dolne, Partners: The municipality of Czarna, Olszica, Solina, Cisna) concerns the construction of units producing energy from RES: solar kits (2,04 to 5.10 kW), solar installations (2,86 to 4.29 kW), biomass boilers (between 15 and 45 kW each), heat pumps (between 6 and 13 kW), in the municipality of Lower Silesia: 144 solar panels, 56 solar installations, 21 heat pumps, boiler...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 12,963 bytes +2,316 Created claim: summary (P836): Partnership project implemented in partnership (Lider-Lmin Ustryki Dolne, Partners: The municipality of Czarna, Olszica, Solina, Cisna) concerns the construction of units producing energy from RES: solar kits (2,04 to 5.10 kW), solar installations (2,86 to 4.29 kW), biomass boilers (between 15 and 45 kW each), heat pumps (between 6 and 13 kW), in the municipality of Lower Silesia: 144 solar panels, 56 solar installations, 21 heat pumps, boilers...

24 February 2020

18 February 2020

31 January 2020

14 January 2020