Revision history of "Installation and installation of renewable energy sources on residential buildings in the communes of Grodzisko Dolne and the City of Leżajsk" (Q118495)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 75,350 bytes +13 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 75,337 bytes −339 Set a claim value: summary (P836): O projeto estabelece o principal objetivo estratégico «Aumentar a utilização de fontes de energia renováveis e reduzir as emissões de poluentes atmosféricos nos municípios de Grodzisko Dolne e Leżajsk, montando 923 instalações residenciais até ao final de 2018 1000 unidades de instalações FER modernas com uma capacidade instalada total de 4,56 MW». O objetivo estratégico será executado com objetivos específicos: — aumentar a utilização de fontes de...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 72,502 bytes +8,064 Changed label, description and/or aliases in lv, it, da, sk, ro, pt, cs, de, sv, et, lt, sl, ga, bg, es, hu, fr, hr, mt, el, fi, nl, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4317:43, 2 July 2022DG Regio talk contribs 62,323 bytes +37,879 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 15,004 bytes +2,087 Created claim: summary (P836): Le projet fixe comme objectif stratégique principal «Améliorer l’utilisation des sources d’énergie renouvelables et réduire les émissions de polluants atmosphériques dans les municipalités de Grodzisko Dolne et de la ville de Leżajsk en installant d’ici fin 2018 1000 installations SER modernes d’une capacité totale installée de 4,56 MW sur 923 bâtiments résidentiels».L’objectif stratégique sera mis en œuvre sur la base d’objectifs spécifiques: l...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,917 bytes +229 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 13,127 bytes +202 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,925 bytes −211 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 13,136 bytes +1,819 Created claim: summary (P836): The project sets the main strategic goal “Increase the use of renewable energy sources and reduce emissions of air pollutants in Grodzisko Dolne and Leżajsk Municipalities by assembling on 923 residential facilities by the end of 2018 1000 units of modern RES installations with a total installed capacity of 4.56 MW”.The strategic goal will be implemented with specific objectives: — increasing the use of renewable energy sources since 2018 throug...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 11,317 bytes −1,754 Removed claim: summary (P836): The project focuses on the strategic objective of “The increase in the use of renewable energy sources and the reduction of air pollutant emissions in the municipalities of the Lower House and the City of Leżajsk by the installation of 1000 modern RES installations with a total installed capacity of 4.56 MW by the end of 2018”. the strategic objective will be pursued through the specific objectives set out: — to increase the use of renewable e...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,782 bytes +1,754 Created claim: summary (P836): The project focuses on the strategic objective of “The increase in the use of renewable energy sources and the reduction of air pollutant emissions in the municipalities of the Lower House and the City of Leżajsk by the installation of 1000 modern RES installations with a total installed capacity of 4.56 MW by the end of 2018”. the strategic objective will be pursued through the specific objectives set out: — to increase the use of renewable ene...

24 February 2020

18 February 2020

31 January 2020

14 January 2020