Revision history of "DEVELOPMENT OF RES IN MUNICIPALITIES: GRĘBÓW, JASIENICA ROSIELNA, ROYAL MAJDAN, BRANDED NIWISKA, OSTRÓW, JUDGES OF MAŁOPOLSKA" (Q118489)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 74,280 bytes −1 Changed label, description and/or aliases in pt
  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 74,281 bytes +16 Set a claim value: summary (P836): O principal objetivo do projeto é atingir uma capacidade adicional de 3,71 MW para produzir eletricidade e calor a partir de fontes renováveis. Para cumprir este objetivo, está prevista a aquisição de instalações fotovoltaicas, bombas de calor de ar com recipientes de água quente e caldeiras de biomassa. As instalações de FER instaladas reduzirão o consumo de fontes de energia não renováveis. As emissões de substâncias nocivas serão reduzidas, o que...

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 71,091 bytes −319 Changed label, description and/or aliases in lv, it, sk, da, et, fi, bg, sl, fr, hu, ga, cs, hr, ro, pt, es, el, nl, sv, lt, de, mt, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 14:3414:34, 27 July 2022DG Regio talk contribs 64,423 bytes +40,701 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 14,913 bytes +2,153 Created claim: summary (P836): L’objectif principal du projet est d’atteindre 3,71 MW de capacité supplémentaire de production d’électricité renouvelable et de production de chaleur. Pour atteindre cet objectif, il est prévu d’acheter des installations photovoltaïques, des pompes à chaleur à air avec des réservoirs de stockage d’eau chaude et des chaudières à biomasse. Les installations SER installées permettront de réduire la consommation de sources d’énergie non renouvelabl...
  • curprev 07:1007:10, 2 December 2021DG Regio talk contribs 12,760 bytes +200 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,999 bytes +189 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,810 bytes −189 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 12,999 bytes +1,972 Created claim: summary (P836): The main objective of the project is to achieve 3.71 MW additional capacity to generate electricity and heat from renewable sources. In order to meet this goal, it is planned to purchase photovoltaic installations, air heat pumps with hot water containers and biomass boilers. Installed RES installations will reduce the consumption of non-renewable energy sources.The emissions of harmful substances will be reduced, which will result in improved a...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 11,027 bytes −1,498 Removed claim: summary (P836): The project has as its primary objective the acquisition of 3.71 MW of additional capacity to generate electricity and heat from renewable sources. In order to meet this objective, the purchase of PV installations, air heat pumps with hot water storage tanks and biomass boilers is planned. The installation of RES installations will reduce the use of non-renewable energy sources. emissions of harmful substances will be reduced, resulting in imp...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:5108:51, 10 March 2020DG Regio talk contribs 11,247 bytes +1,498 Created claim: summary (P836): The project has as its primary objective the acquisition of 3.71 MW of additional capacity to generate electricity and heat from renewable sources. In order to meet this objective, the purchase of PV installations, air heat pumps with hot water storage tanks and biomass boilers is planned. The installation of RES installations will reduce the use of non-renewable energy sources. emissions of harmful substances will be reduced, resulting in impro...

24 February 2020

18 February 2020

31 January 2020

14 January 2020