Revision history of "Installation of renewable energy systems for households from the municipality of Piastowe and the municipality of Chorkówka" (Q118473)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 85,784 bytes +6 Changed label, description and/or aliases in pt
  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 85,778 bytes −68 Set a claim value: summary (P836): É uma areia. Em Chorkówka, o projeto abrangerá 431 agregados familiares com 489 instalações de energias renováveis, incluindo 107 conjuntos de coletores solares planos; 326 instalações fotovoltaicas e 56 caldeiras de aquecimento central por biomassa. O projeto incluirá 321 agregados familiares com 375 instalações de energias renováveis, incluindo 313 instalações fotovoltaicas e 62 caldeiras de aquecimento central a biomassa. Tal permitirá aumentar a...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5019:50, 2 March 2023DG Regio talk contribs 82,672 bytes +1,925 Changed label, description and/or aliases in it, da, sk, fi, cs, el, fr, sv, et, de, bg, es, ga, lv, lt, pt, hu, ro, hr, sl, nl, mt, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4217:42, 2 July 2022DG Regio talk contribs 78,629 bytes +50,745 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:0307:03, 2 December 2021DG Regio talk contribs 16,789 bytes +2,829 Created claim: summary (P836): C’est un Piast. Dans la municipalité de Chorkówka, le projet couvrira 431 ménages avec 489 installations utilisant des sources d’énergie renouvelables, dont 107 ensembles de capteurs solaires plats; 326 installations photovoltaïques et 56 chaudières à biomasse de chauffage central. Le projet couvrira 321 ménages disposant de 375 installations d’énergie renouvelable, dont 313 installations photovoltaïques et 62 chaudières de chauffage central à b...
  • curprev 07:0307:03, 2 December 2021DG Regio talk contribs 13,960 bytes +201 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 14,198 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 14,014 bytes −181 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 14,195 bytes +2,470 Created claim: summary (P836): It’s a sandy one. In Chorkówka the project will cover 431 households with 489 renewable energy installations, including 107 sets of flat solar collectors; 326 photovoltaic installations and 56 central heating boilers per biomass. The project will include 321 households with 375 renewable energy installations, including 313 photovoltaic installations and 62 biomass central heating boilers. This will allow for additional production capacity: — ele...
  • curprev 16:2016:20, 20 October 2020DG Regio talk contribs 11,725 bytes −2,027 Removed claim: summary (P836): Held. In the municipality of Chorkówka, 431 households will be included in the project, which will include 489 installations using renewable energy sources, including 107 flat solar collectors kits; 326 solar and 56 biomass heating boilers. 321 households will be included in the Piastate project where 375 renewable energy sources, including 313 solar installations and 62 central biomass heating boilers, will be installed. This will allow for t...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4908:49, 10 March 2020DG Regio talk contribs 12,468 bytes +2,027 Created claim: summary (P836): Held. In the municipality of Chorkówka, 431 households will be included in the project, which will include 489 installations using renewable energy sources, including 107 flat solar collectors kits; 326 solar and 56 biomass heating boilers. 321 households will be included in the Piastate project where 375 renewable energy sources, including 313 solar installations and 62 central biomass heating boilers, will be installed. This will allow for the...

24 February 2020

18 February 2020

31 January 2020

14 January 2020