Revision history of "Extension of the offer of Stanislaw Rembisz – Manufacturing – Service – Commercial KOBEX with innovative hangar halls" (Q118401)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 49,866 bytes +7 Changed label, description and/or aliases in pt
  • curprev 15:3515:35, 7 October 2024DG Regio talk contribs 49,859 bytes −21 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar o nível de competitividade da empresa através da introdução de um novo produto na oferta da empresa de hangares aeroespaciais inovadores, concebidos e fabricados de forma a permitir um reforço, adaptação, manutenção e expansão fáceis e rápidos. O projeto inclui o fornecimento de máquinas e equipamentos especializados e a construção de uma cobertura de 26 x 72 metros.

22 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:4117:41, 2 July 2022DG Regio talk contribs 45,384 bytes +26,834 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 12,662 bytes +1,349 Created claim: summary (P836): L’objectif principal du projet est d’augmenter le niveau de compétitivité de l’entreprise en introduisant un nouveau produit à l’offre de l’entreprise de structures en acier innovantes telles que le hangar à air, conçu et construit de manière à ce qu’il soit possible de les renforcer facilement et rapidement, de les adapter, de les entretenir et de s’étendre. Le projet comprend la fourniture de machines et d’équipements spécialisés et la constru...
  • curprev 07:0907:09, 2 December 2021DG Regio talk contribs 11,313 bytes +188 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:0116:01, 20 October 2020DG Regio talk contribs 11,564 bytes +183 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0116:01, 20 October 2020DG Regio talk contribs 11,381 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0116:01, 20 October 2020DG Regio talk contribs 11,549 bytes +1,245 Created claim: summary (P836): The main objective of the project is to increase the level of competitiveness of the company by introducing a new product to the company’s offer of innovative aerospace hangars, designed and manufactured in such a way as to allow for easy and rapid reinforcement, adaptation, maintenance and expansion.The project includes the supply of specialised machinery and equipment and the construction of a roof of 26 x 72 meters., translated_summary
  • curprev 16:0116:01, 20 October 2020DG Regio talk contribs 10,304 bytes −800 Removed claim: summary (P836): The primary objective of the project is to increase the level of competitiveness of the firm by introducing into the offer of the firm a new product of the innovative type of steel hangar, designed and constructed in such a way as to be easily and rapidly upgraded, adapted, maintained and extended. the project covers the provision of specialised machinery and equipment and the construction of a roof covering 26 x 72 metres., remove_old_english...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4808:48, 10 March 2020DG Regio talk contribs 9,810 bytes +800 Created claim: summary (P836): The primary objective of the project is to increase the level of competitiveness of the firm by introducing into the offer of the firm a new product of the innovative type of steel hangar, designed and constructed in such a way as to be easily and rapidly upgraded, adapted, maintained and extended. the project covers the provision of specialised machinery and equipment and the construction of a roof covering 26 x 72 metres., Adding English summary

24 February 2020

18 February 2020

31 January 2020

14 January 2020