Revision history of "Implementation of hydro-forming of hard-deformable steel thickeners in the range of diameters Fi 21.3 to Fi 88.9 with full automation of machining and marking process" (Q117975)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1816:18, 10 October 2024DG Regio talk contribs 55,063 bytes −6 Changed label, description and/or aliases in pt
  • curprev 16:1816:18, 10 October 2024DG Regio talk contribs 55,069 bytes −13 Set a claim value: summary (P836): O objectivo do projecto é implementar para a produção e venda de novos produtos formados a frio hidro-formação em tecnologias livres de resíduos de ferrite, aços martenzitic e resistentes à corrosão. O projecto envolve a aquisição de máquinas necessárias para a implementação de novas tecnologias e a adaptação da sala de produção em Stalowa Wola para instalação e montagem de máquinas planeadas. O projeto inclui também a modernização dos comutadores e...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:4919:49, 2 March 2023DG Regio talk contribs 51,908 bytes +638 Changed label, description and/or aliases in sk, it, da, lv, et, fi, hr, cs, sv, de, ro, sl, lt, fr, bg, pt, es, nl, el, ga, hu, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

5 September 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 13,026 bytes +1,387 Created claim: summary (P836): L’objectif du projet est de mettre en œuvre de nouveaux produits formés à froid dans des aciers ferritiques, martensitiques et résistants à la corrosion non déchet. Le projet implique l’achat de machines nécessaires à la mise en œuvre de la nouvelle technologie et l’adaptation du hall de production de Stalowa Wola pour l’installation et l’assemblage de machines planifiées. Le projet comprend également la modernisation de l’appareillage électriqu...
  • curprev 07:1807:18, 2 December 2021DG Regio talk contribs 11,639 bytes +256 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:3015:30, 20 October 2020DG Regio talk contribs 11,822 bytes +226 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3015:30, 20 October 2020DG Regio talk contribs 11,596 bytes −197 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3015:30, 20 October 2020DG Regio talk contribs 11,793 bytes +1,336 Created claim: summary (P836): The aim of the project is to implement for the production and sale of new cold-formed products hydro-forming in waste-free technologies of ferrite, martenzytic and corrosion-resistant steels. The project involves the purchase of machines necessary for the implementation of new technology and the adaptation of the production hall in Stalowa Wola for installation and assembly of planned machines. The project also includes the modernisation of the...
  • curprev 15:3015:30, 20 October 2020DG Regio talk contribs 10,457 bytes −934 Removed claim: summary (P836): The purpose of the project is to implement for the production and sale of new products which are cold shaped by the hydro-forming method in clean, martensitic and corrosion resistant steel. The project involves the purchase of machinery necessary for the implementation of the new technology and the adaptation of the Stalowa Wola production hall for the purposes of installing and installing the planned machinery. The project also includes the m...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4208:42, 10 March 2020DG Regio talk contribs 10,099 bytes +934 Created claim: summary (P836): The purpose of the project is to implement for the production and sale of new products which are cold shaped by the hydro-forming method in clean, martensitic and corrosion resistant steel. The project involves the purchase of machinery necessary for the implementation of the new technology and the adaptation of the Stalowa Wola production hall for the purposes of installing and installing the planned machinery. The project also includes the mod...

24 February 2020

18 February 2020

31 January 2020

14 January 2020