Revision history of "Optimisation of the production process of components for the automotive industry using extrusion process monitoring and computational intelligence methods" (Q117932)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 95,023 bytes +12 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 95,011 bytes +27 Set a claim value: summary (P836): Em ligação com a política da empresa, ou seja, líder do projeto, Zeto – Rzeszów Sp. z o.o. (LP) e Project Partner (PP), ou seja, Żbik Sp. z o.o., centrada na implementação da prática industrial da Indústria 4.0, bem como na necessidade de adaptar a oferta às crescentes necessidades do mercado, o consórcio decidiu executar o projeto na área de I & D trabalhos destinados a desenvolver um sistema integrado de controlo do processo de produção implementa...

7 March 2024

15 January 2024

13 December 2023

6 July 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:4919:49, 2 March 2023DG Regio talk contribs 91,810 bytes +1,190 Changed label, description and/or aliases in da, it, sk, sv, el, fi, lv, ga, cs, fr, sl, pt, hu, ro, et, de, hr, es, nl, lt, bg, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 14:2514:25, 27 July 2022DG Regio talk contribs 88,517 bytes +57,820 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 07:0207:02, 2 December 2021DG Regio talk contribs 17,651 bytes +2,966 Created claim: summary (P836): Dans le cadre de la politique des entreprises, c’est-à-dire Chef de projet, Zeto — Rzeszów Sp. z o.o. (LP) et partenaire de projet (PP) c.-à-d. Le consortium a décidé de mettre en œuvre le projet dans le domaine des travaux de R & D visant à développer un système intégré de contrôle du processus de production réalisé dans le secteur manufacturier, en soutenant et en optimisant les décisions importantes de gestion par le biais d’une supervision e...
  • curprev 07:0207:02, 2 December 2021DG Regio talk contribs 14,685 bytes +246 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 07:0007:00, 21 October 2020DG Regio talk contribs 14,878 bytes +214 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:0007:00, 21 October 2020DG Regio talk contribs 14,664 bytes −194 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 07:0007:00, 21 October 2020DG Regio talk contribs 14,858 bytes +2,869 Created claim: summary (P836): In connection with company policy i.e. Project leader, Zeto – Rzeszów Sp. z o.o. (LP) and Project Partner (PP) i.e. Żbik Sp. z o.o., focused on implementing the industrial practice of Industry 4.0, as well as the need to adapt the offer to the growing requirements of the market, the consortium decided to implement the project in the area of R & D works aimed at developing an integrated system of control of the production process implemented in t...
  • curprev 07:0007:00, 21 October 2020DG Regio talk contribs 11,989 bytes −2,166 Removed claim: summary (P836): In relation to the company’s policy, i.e. Project leader, Zeto — Rzeszów Sp. z o.o (LP) and Project Partner (PP): Zbit Sp. z o.o, focused on the implementation of Industry 4.0 in industrial practice and the need to adapt the bid to the increasing market demands, the consortium decided to carry out in the area of R & D work directed towards the development of an integrated manufacturing control system for manufacturing, enabling and optimising...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4608:46, 10 March 2020DG Regio talk contribs 12,871 bytes +2,166 Created claim: summary (P836): In relation to the company’s policy, i.e. Project leader, Zeto — Rzeszów Sp. z o.o (LP) and Project Partner (PP): Zbit Sp. z o.o, focused on the implementation of Industry 4.0 in industrial practice and the need to adapt the bid to the increasing market demands, the consortium decided to carry out in the area of R & D work directed towards the development of an integrated manufacturing control system for manufacturing, enabling and optimising es...

24 February 2020

18 February 2020

31 January 2020

14 January 2020