Revision history of "Installation of solar collectors on residential buildings in the municipality of Nurzec-Stacja" (Q117500)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3615:36, 7 October 2024DG Regio talk contribs 91,369 bytes +4 Changed label, description and/or aliases in pt
  • curprev 15:3615:36, 7 October 2024DG Regio talk contribs 91,365 bytes −19 Set a claim value: summary (P836): O principal objetivo do projeto Mon. «Instalação de coletores solares em edifícios residenciais no município de Nurzec-Stacja» é aumentar a quota de fontes de energia renováveis na produção de calor no município de Nurzec-Stacja. O projeto pressupõe que, até setembro de 2018, serão instalados coletores solares com uma capacidade total instalada de 269,87 kW em 87 edifícios privados, utilizados para a produção de água quente. Os parâmetros técnicos d...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 23:3823:38, 2 March 2023DG Regio talk contribs 87,849 bytes +1,142 Changed label, description and/or aliases in bg, cs, da, de, el, es, et, fi, fr, ga, hr, hu, it, lt, lv, mt, nl, pt, ro, sk, and other parts

19 October 2022

27 July 2022

  • curprev 14:1814:18, 27 July 2022DG Regio talk contribs 85,893 bytes +55,311 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 18,318 bytes +3,064 Created claim: summary (P836): L’objectif premier du projet: «Installation de capteurs solaires sur des bâtiments résidentiels dans la municipalité de Nurzec-Station» est d’augmenter la part des sources d’énergie renouvelables dans la production d’énergie thermique dans la municipalité de Nurzec-Station. Le projet suppose que d’ici septembre 2018, 87 bâtiments privés seront équipés de capteurs solaires d’une puissance installée totale de 269,87 kW pour la production d’eau cha...
  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 15,254 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:0917:09, 20 October 2020DG Regio talk contribs 15,527 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0917:09, 20 October 2020DG Regio talk contribs 15,374 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0917:09, 20 October 2020DG Regio talk contribs 15,528 bytes +2,740 Created claim: summary (P836): The primary objective of the project Mon. “Installation of solar collectors on residential buildings in the municipality of Nurzec-Stacja” is to increase the share of renewable energy sources in the production of heat in the Nurzec-Stacja Municipality. The project assumes that by September 2018, solar collectors with a total installed capacity of 269.87 kW will be installed on 87 private buildings, used for the production of hot water. The techn...
  • curprev 17:0917:09, 20 October 2020DG Regio talk contribs 12,788 bytes −2,308 Removed claim: summary (P836): The main objective of the project: “The installation of solar collectors on residential buildings in the municipality of Nunzeic-Station” is an increase in the share of renewable energy sources in the production of thermal energy in the municipality of Nuzec-Station. The project assumes that by September 2018, solar collectors with a total installed capacity of 269.87 kW will be installed in 87 private buildings for hot water production. The t...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3008:30, 10 March 2020DG Regio talk contribs 13,381 bytes +2,308 Created claim: summary (P836): The main objective of the project: “The installation of solar collectors on residential buildings in the municipality of Nunzeic-Station” is an increase in the share of renewable energy sources in the production of thermal energy in the municipality of Nuzec-Station. The project assumes that by September 2018, solar collectors with a total installed capacity of 269.87 kW will be installed in 87 private buildings for hot water production. The tec...

24 February 2020

18 February 2020

31 January 2020

14 January 2020