Revision history of "Revitalisation of urban parks in Dąbrowa Bialystok at Kosciuszko Square" (Q117479)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2206:22, 9 October 2024DG Regio talk contribs 81,273 bytes −3 Changed label, description and/or aliases in pt
  • curprev 06:2206:22, 9 October 2024DG Regio talk contribs 81,276 bytes −39 Set a claim value: summary (P836): No âmbito do projecto de parceria implementado pelo líder: Município de Dąbrowa Białostocka e sócio: A Fundação GAMA revitalizará dois parques urbanos em pequena escala na Plac T. Kościuszki em Dąbrowa Białostocka. Prevê-se: — desmantelar caminhos e elementos de pequena arquitetura existentes, transferência de monumentos; — corte de árvores, remoção de arbustos, exagero; — construção do endurecimento de caminhos pedonais, criação de memoriais e loca...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4819:48, 2 March 2023DG Regio talk contribs 77,780 bytes +1,028 Changed label, description and/or aliases in da, it, sk, cs, lv, et, fi, pt, sv, hr, de, ga, el, hu, bg, nl, ro, fr, es, lt, mt, sl, and other parts

19 October 2022

2 July 2022

  • curprev 17:2017:20, 2 July 2022DG Regio talk contribs 75,940 bytes +47,986 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:4206:42, 2 December 2021DG Regio talk contribs 17,150 bytes +2,673 Created claim: summary (P836): Dans le cadre du projet partenaire mis en œuvre par le chef de file: Commune de Dąbrowa Białostocka et partenaire: La Fondation Gama sera revitalisée sur une petite échelle de deux parcs urbains sur la place T. Kościuszki à Dąbrowa Białostok. Prévu: — démantèlement des chemins existants et des éléments de petites architectures, monuments en mouvement; — abattage des arbres, enlèvement des arbustes, replantation; — construction de sentiers pédest...
  • curprev 06:4206:42, 2 December 2021DG Regio talk contribs 14,477 bytes +139 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:2617:26, 20 October 2020DG Regio talk contribs 14,777 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:2617:26, 20 October 2020DG Regio talk contribs 14,646 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:2617:26, 20 October 2020DG Regio talk contribs 14,784 bytes +2,435 Created claim: summary (P836): Within the framework of the partnership project implemented by the leader: Dąbrowa Białostocka commune and partner: The GAMA Foundation will revitalise two urban parks on a small scale at Plac T. Kościuszki in Dąbrowa Białostocka. It is planned to: — dismantling existing paths and elements of small architecture, transfer of monuments; — tree cutting, removal of shrubs, exaggeration; — construction of the hardening of footpaths, creation of memor...
  • curprev 17:2617:26, 20 October 2020DG Regio talk contribs 12,349 bytes −1,976 Removed claim: summary (P836): As part of a leadership project carried out by the Leader: Dąbrowowa Białostocka and a partner: In the small scale of two urban parks in Placu T. Kościuszki in Dąbrowa Białostocka, the GMMA Foundation will be carried out. Planned: Dismantling of existing pathways and small architecture elements, transfer of monuments; Felling of trees, removal of bushes, replanting; Construction of the hardening of pedestrian paths, the creation of places of r...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3008:30, 10 March 2020DG Regio talk contribs 12,599 bytes +1,976 Created claim: summary (P836): As part of a leadership project carried out by the Leader: Dąbrowowa Białostocka and a partner: In the small scale of two urban parks in Placu T. Kościuszki in Dąbrowa Białostocka, the GMMA Foundation will be carried out. Planned: Dismantling of existing pathways and small architecture elements, transfer of monuments; Felling of trees, removal of bushes, replanting; Construction of the hardening of pedestrian paths, the creation of places of rem...

24 February 2020

18 February 2020

31 January 2020

14 January 2020