Revision history of "Improve accessibility to pre-school education by adapting the existing building of primary school No. 5 in Zambrowa for pre-school education." (Q117342)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3615:36, 7 October 2024DG Regio talk contribs 90,939 bytes +7 Changed label, description and/or aliases in pt
  • curprev 15:3615:36, 7 October 2024DG Regio talk contribs 90,932 bytes +8 Set a claim value: summary (P836): O projeto «Melhorar a acessibilidade ao ensino pré-escolar através da adaptação do atual edifício da escola primária n.o 5 em Zambrowa para efeitos de ensino pré-escolar» será executado no período de junho de 2017 a outubro de 2018. O projeto tem por objeto a reconstrução e modernização do atual edifício n.o 5 da escola primária para efeitos de um estabelecimento de ensino pré-escolar com grupos de infantários (custos inelegíveis). O projeto previa...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4719:47, 2 March 2023DG Regio talk contribs 87,389 bytes +1,108 Changed label, description and/or aliases in it, da, sk, ga, et, fi, hr, de, el, bg, lv, sv, fr, pt, cs, es, nl, ro, hu, lt, sl, mt, and other parts

19 October 2022

2 July 2022

  • curprev 17:1717:17, 2 July 2022DG Regio talk contribs 85,468 bytes +55,028 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:4006:40, 2 December 2021DG Regio talk contribs 18,352 bytes +2,954 Created claim: summary (P836): Le projet «Améliorer l’accessibilité à l’enseignement préscolaire par l’adaptation du bâtiment existant de l’école primaire no 5 à Zambrow pour l’enseignement préscolaire» sera mis en œuvre entre juin 2017 et octobre 2018. Le projet a pour objet la reconstruction et la modernisation du bâtiment existant de l’école primaire no 5 en vue d’un établissement préscolaire avec groupes de crèches (coûts non admissibles). Dans le cadre du projet, une gam...
  • curprev 06:4006:40, 2 December 2021DG Regio talk contribs 15,398 bytes +223 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:3816:38, 20 October 2020DG Regio talk contribs 15,614 bytes +201 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3816:38, 20 October 2020DG Regio talk contribs 15,413 bytes −197 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3816:38, 20 October 2020DG Regio talk contribs 15,610 bytes +2,756 Created claim: summary (P836): The project “Improving accessibility to preschool education by adapting the existing primary school building no. 5 in Zambrowa for the purposes of pre-school education” will be implemented in the period from June 2017 to October 2018. The subject of the project is the reconstruction and modernisation of the existing primary school building No. 5 for the purposes of a pre-school facility with nursery groups (ineligible costs). The project planned...
  • curprev 16:3816:38, 20 October 2020DG Regio talk contribs 12,854 bytes −2,201 Removed claim: summary (P836): The project “Improving access to pre-school education by adapting the existing building at the Primary School No 5 in Zamość for pre-school education” will be implemented between June 2017 and October 2018. The aim of the project is to rebuild and modernise the existing building in Primary School No 5 for the purposes of the pre-school facility with nursery groups (non-eligible costs). The project is intended to cover the full range of investm...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2608:26, 10 March 2020DG Regio talk contribs 13,334 bytes +2,201 Created claim: summary (P836): The project “Improving access to pre-school education by adapting the existing building at the Primary School No 5 in Zamość for pre-school education” will be implemented between June 2017 and October 2018. The aim of the project is to rebuild and modernise the existing building in Primary School No 5 for the purposes of the pre-school facility with nursery groups (non-eligible costs). The project is intended to cover the full range of investmen...

24 February 2020

18 February 2020

31 January 2020

14 January 2020