Revision history of "Limiting the introduction of uncleanness into the environment through the construction of sanitary sewage system (III stage) with the reconstruction of the water supply network and modernisation of the water intake “Grabowiec” in Mielnik" (Q117133)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 88,369 bytes −9 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 88,378 bytes −10 Set a claim value: summary (P836): No âmbito do investimento, prevê-se: 1) Construção de esgotos em Mielnik – fase III – canal de 921,00 m, 34 ramais, 1 estação de bombagem individual; 2) Reconstrução da rede de abastecimento de água em Mielnik (com um comprimento total de 0,85 km) nas ruas: a. Branco (0,53 km de comprimento); B. Dubois (0,32 km de comprimento); 3) Modernização do sistema de captação de água «Grabowiec» em Mielnik: a. Reconstrução de nós de água nos poços de águas pr...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4719:47, 2 March 2023DG Regio talk contribs 85,630 bytes +669 Changed label, description and/or aliases in it, da, sk, de, hr, ga, fi, et, bg, el, pt, sv, lv, cs, fr, ro, es, nl, lt, hu, sl, mt, and other parts

20 October 2022

27 July 2022

  • curprev 14:1314:13, 27 July 2022DG Regio talk contribs 84,145 bytes +53,938 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 18,057 bytes +2,850 Created claim: summary (P836): L’investissement est prévu pour: 1) Construction d’égouts à Mielnik — stade III — 921,00 m de chenal, 34 branches, 1 station de pompage individuelle; 2) Reconstruction du réseau d’approvisionnement en eau de Mielnik (d’une longueur totale de 0,85 km) dans les rues: a. Blanc (0,53 km de long); B. Dubois (d’une longueur de 0,32 km); 3) Modernisation de la prise d’eau «Grabowiec» à Mielnik: a. reconstruction des jonctions d’eau dans les puits profo...
  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 15,207 bytes +329 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:3715:37, 20 October 2020DG Regio talk contribs 15,317 bytes +301 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3715:37, 20 October 2020DG Regio talk contribs 15,016 bytes −296 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3715:37, 20 October 2020DG Regio talk contribs 15,312 bytes +2,560 Created claim: summary (P836): As part of the investment, it is planned to: 1) Sewerage construction in Mielnik – stage III – 921.00 m canal, 34 branches, 1 individual pumping plant; 2) Reconstruction of the water supply network in Mielnik (with a total length of 0.85 km) in the streets: a. White (0.53 km long); B. Dubois (0.32 km long); 3) Modernisation of the water intake “Grabowiec” in Mielnik: a. Reconstruction of water nodes in deep-sea wells SW1 on plot No 6852 and SW2...
  • curprev 15:3715:37, 20 October 2020DG Regio talk contribs 12,752 bytes −2,157 Removed claim: summary (P836): As part of the investment, it is planned to: 1) Construction of a sewerage system in Mielec — III step — 921.00 m of the channel, 34 branches, 1 individual pumping station; 2) Construction of water supply network in Mielec (of a total length of 0.85 km) in the streets: A. Biała (of a length of 0.53 km); Mr DUBOSA (of a length of 0.32 km); 3) Modernisation of the water intake of ‘Grabowiec’ in Mielec: a. construction of water nodes on deep-sea...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2508:25, 10 March 2020DG Regio talk contribs 13,194 bytes +2,157 Created claim: summary (P836): As part of the investment, it is planned to: 1) Construction of a sewerage system in Mielec — III step — 921.00 m of the channel, 34 branches, 1 individual pumping station; 2) Construction of water supply network in Mielec (of a total length of 0.85 km) in the streets: A. Biała (of a length of 0.53 km); Mr DUBOSA (of a length of 0.32 km); 3) Modernisation of the water intake of ‘Grabowiec’ in Mielec: a. construction of water nodes on deep-sea we...

24 February 2020

18 February 2020

31 January 2020

14 January 2020