Revision history of "Improving the quality of the environment in Shepietowo by developing roof coverings containing asbestos" (Q117122)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 76,851 bytes +16 Changed label, description and/or aliases in pt
  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 76,835 bytes −6 Set a claim value: summary (P836): O projecto consiste na gestão de resíduos que contêm amianto. O projeto prevê: receção das instalações dos residentes do município, transporte e eliminação (por armazenagem no aterro) de revestimentos de cobertura desmontados que contenham amianto. O projeto não inclui a desmontagem de revestimentos de telhados. As coberturas que contêm amianto já foram desmanteladas. O objetivo geral do projeto é aumentar a atratividade económica da região, protege...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:4616:46, 2 March 2023DG Regio talk contribs 74,083 bytes +1,225 Changed label, description and/or aliases in lv, it, da, sk, pt, lt, sv, hu, fi, fr, ga, es, bg, el, nl, sl, et, hr, ro, cs, mt, de, and other parts

20 October 2022

27 July 2022

  • curprev 14:1314:13, 27 July 2022DG Regio talk contribs 72,039 bytes +45,163 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 16,809 bytes +2,453 Created claim: summary (P836): Le projet porte sur la gestion des déchets contenant de l’amiante. Dans le cadre du projet: enlèvement de la propriété des résidents de la municipalité, transport et élimination (par mise en décharge) des revêtements de toiture démantelés contenant de l’amiante. Le projet n’inclut pas le démantèlement des toitures. Des revêtements contenant de l’amiante ont déjà été démontés. L’objectif général du projet est d’accroître l’attractivité économique...
  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 14,356 bytes +204 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 14,591 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 14,428 bytes −172 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 14,600 bytes +2,287 Created claim: summary (P836): The project consists of the management of waste containing asbestos. The project plans to: reception from the premises of residents of the commune, transport and disposal (by storage on the landfill) of dismantled roof coverings containing asbestos. The project does not include the dismantling of roof coverings. Asbestos-containing covers have already been dismantled. The overall objective of the project is to increase the economic attractivenes...
  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 12,313 bytes −1,795 Removed claim: summary (P836): The project consists of the use of waste containing asbestos. The project is designed to: reception by municipal residents, transportation and disposal (by landfill) of dismantled roof coverings containing asbestos. The project does not cover the dismantling of roof coverings. Asbestos covers have already been dismantled. The general objective of the project is to enhance the economic attractiveness of the region by protecting the potential of...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2508:25, 10 March 2020DG Regio talk contribs 12,396 bytes +1,795 Created claim: summary (P836): The project consists of the use of waste containing asbestos. The project is designed to: reception by municipal residents, transportation and disposal (by landfill) of dismantled roof coverings containing asbestos. The project does not cover the dismantling of roof coverings. Asbestos covers have already been dismantled. The general objective of the project is to enhance the economic attractiveness of the region by protecting the potential of t...

24 February 2020

18 February 2020

31 January 2020

14 January 2020