Revision history of "Modernisation of individual sources of heat or electricity in the municipality of Czarna Białostocka" (Q117109)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

20 October 2022

2 July 2022

  • curprev 17:1217:12, 2 July 2022DG Regio talk contribs 58,975 bytes +35,934 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 15,094 bytes +1,893 Created claim: summary (P836): Dans le cadre du projet d’installations solaires, il est prévu d’acheter et d’installer 215 installations solaires complètes soutenant la production d’eau chaude sanitaire dans des exploitations individuelles. Le projet prévoit une adaptation individuelle de la taille et de la capacité de l’installation aux besoins de l’exploitation sur la base du programme d’utilisation fonctionnelle. Le projet prévoit de soutenir le processus de préparation de...
  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 13,201 bytes +175 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 13,465 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 13,304 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 13,469 bytes +1,682 Created claim: summary (P836): As part of the solar installations part of the project, it is planned to purchase and install 215 complete solar installations supporting the production of hot water (c.w.u.) on individual farms. The project provides for individual adaptation of the size and power of the installation to the needs of the farm on the basis of the Functional Use Program. The project envisages supporting the process of preparing hot water using solar system and thus...
  • curprev 15:3615:36, 20 October 2020DG Regio talk contribs 11,787 bytes −1,303 Removed claim: summary (P836): As part of the solar installation project, the purchase and installation of 215 items of complete solar water generating installations for domestic hot water (hot water) are planned to be purchased and assembled on individual holdings. The project provides for the individual adjustment of the size and capacity of the installation to the needs of the farm on the basis of the Operational Programme. The project provides support to the process of...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2408:24, 10 March 2020DG Regio talk contribs 11,370 bytes +1,303 Created claim: summary (P836): As part of the solar installation project, the purchase and installation of 215 items of complete solar water generating installations for domestic hot water (hot water) are planned to be purchased and assembled on individual holdings. The project provides for the individual adjustment of the size and capacity of the installation to the needs of the farm on the basis of the Operational Programme. The project provides support to the process of pr...

24 February 2020

18 February 2020

31 January 2020

14 January 2020