Revision history of "Thermal modernisation of the John Paul II School Complex in Wyszki" (Q117047)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 87,287 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 87,283 bytes −133 Set a claim value: summary (P836): O projeto previsto consistirá na realização de obras relacionadas com a modernização térmica profunda e a instalação de uma instalação fotovoltaica no telhado do edifício da escola. A. Os trabalhos de termomodernização incluirão: — isolamento térmico das paredes com placas de isopor: 1. Fundação: coeficiente de transferência térmica U [W/(m2K)]: antes de 0,541, depois de 0,190. 2. pedestais: coeficiente de transferência térmica U [W/(m2K)]: antes de...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:5818:58, 2 March 2023DG Regio talk contribs 84,658 bytes +2,578 Changed label, description and/or aliases in it, da, lv, sk, es, sl, fi, et, hr, ga, sv, fr, cs, lt, el, de, bg, nl, pt, mt, hu, ro, and other parts

20 October 2022

2 July 2022

  • curprev 17:1117:11, 2 July 2022DG Regio talk contribs 81,271 bytes +51,171 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:3406:34, 2 December 2021DG Regio talk contribs 17,944 bytes +3,058 Created claim: summary (P836): Le projet envisagé consistera en la réalisation de travaux liés à la thermomodernisation profonde et à l’installation d’une installation photovoltaïque sur le toit du bâtiment de l’école. A. Les travaux de thermomodernisation comprendront: — isolation thermique des murs à l’aide de plaques de polystyrène: 1. Fondation: coefficient de transfert de chaleur U [W/(m2K)]: avant 0.541, après 0.190. 2. Circulaire: coefficient de transfert de chaleur U...
  • curprev 06:3406:34, 2 December 2021DG Regio talk contribs 14,886 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 15,184 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 15,059 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 15,192 bytes +2,568 Created claim: summary (P836): The planned project will consist of carrying out works related to deep thermal modernisation and installation of a photovoltaic installation on the roof of the school building. A. Thermomodernisation works will include: — thermal insulation of walls using styrofoam plates: 1. Foundation: heat transfer coefficient U [W/(m2K)]: before 0,541, after 0,190. 2. pedestals: heat transfer coefficient U [W/(m2K)]: before 0,524, after 0,161. 3. Outer: heat...
  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 12,624 bytes −2,193 Removed claim: summary (P836): The project will consist of the completion of works related to the deep thermal modernisation and installation of the photovoltaic installation on the roof of the school. A. The work of thermal modernisation will include, but not be limited to: — thermal insulation of walls using styrofoam plates: 1. fundamental: heat transfer coefficient U [W/(m2K)]: before 0,541, after 0,190. For the following reasons: heat transfer coefficient U [W/(m2K)]:...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4108:41, 10 March 2020DG Regio talk contribs 13,094 bytes +2,193 Created claim: summary (P836): The project will consist of the completion of works related to the deep thermal modernisation and installation of the photovoltaic installation on the roof of the school. A. The work of thermal modernisation will include, but not be limited to: — thermal insulation of walls using styrofoam plates: 1. fundamental: heat transfer coefficient U [W/(m2K)]: before 0,541, after 0,190. For the following reasons: heat transfer coefficient U [W/(m2K)]: be...

24 February 2020

18 February 2020

31 January 2020

14 January 2020