Revision history of "THERMAL MODERNISATION OF THE MUNICIPAL OFFICE BUILDING IN KLUKÓW" (Q117039)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 68,387 bytes −11 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 68,398 bytes +15 Set a claim value: summary (P836): No âmbito do projeto, está prevista uma modernização térmica do edifício do Gabinete Municipal de Kluków, que consiste em: * aquecimento quando justificado – divisórias do edifício na medida do necessário para cumprir os requisitos do WT 2021, incluindo a substituição da maior parte da carpintaria, * conversão da sala da caldeira – em vez de uma antiga caldeira de baixa eficiência, será instalada uma bomba de calor com um permutador de calor no solo...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4418:44, 2 March 2023DG Regio talk contribs 65,625 bytes −226 Changed label, description and/or aliases in lv, it, da, sk, fr, sl, hr, fi, sv, ga, de, bg, pt, lt, ro, et, hu, es, mt, el, cs, nl, and other parts

20 October 2022

2 July 2022

  • curprev 17:1117:11, 2 July 2022DG Regio talk contribs 65,034 bytes +40,442 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:3406:34, 2 December 2021DG Regio talk contribs 15,760 bytes +2,224 Created claim: summary (P836): Le projet prévoit de thermomoderniser le bâtiment du bureau municipal de Kluków, qui comprend: * chauffage lorsque cela se justifie — cloisons de bâtiment dans la mesure nécessaire pour satisfaire aux exigences WT 2021, y compris le remplacement de la majeure partie de la menuiserie de trous, * reconstruction de la chaufferie — au lieu de l’ancienne chaudière à faible rendement, une pompe à chaleur avec un échangeur de chaleur souterrain, souten...
  • curprev 06:3406:34, 2 December 2021DG Regio talk contribs 13,536 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 13,851 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 13,727 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 13,848 bytes +1,977 Created claim: summary (P836): As part of the project, a thermal modernisation of the building of the Municipal Office in Kluków is planned, consisting of: * warming up where justified – partitions of the building to the extent necessary to meet WT 2021 requirements, including the replacement of most of the hole carpentry, * conversion of the boiler room – in place of an old low-efficiency boiler, a heat pump with a ground heat exchanger will be installed, assisted by a new o...
  • curprev 15:2015:20, 20 October 2020DG Regio talk contribs 11,871 bytes −1,488 Removed claim: summary (P836): As part of the project, a thermal renovation of the Building Office of the Municipality of Cluj is planned: * Building the building envelope, where justified, to the extent necessary to comply with the requirements of WT 2021, including the replacement of most hole joinery, * conversion of boiler rooms, instead of the old low efficiency boiler, a heat pump with the ground heat exchanger assisted by a new oil boiler (peak heat generator) will b...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4108:41, 10 March 2020DG Regio talk contribs 11,644 bytes +1,488 Created claim: summary (P836): As part of the project, a thermal renovation of the Building Office of the Municipality of Cluj is planned: * Building the building envelope, where justified, to the extent necessary to comply with the requirements of WT 2021, including the replacement of most hole joinery, * conversion of boiler rooms, instead of the old low efficiency boiler, a heat pump with the ground heat exchanger assisted by a new oil boiler (peak heat generator) will be...

24 February 2020

18 February 2020

31 January 2020

14 January 2020