Revision history of "ENERGY MODERNISATION OF THE SCHOOL COMPLEX NO. 2 IN HAJNÓWKA WITH THE USE OF RES INSTALLATIONS" (Q116992)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:3600:36, 3 March 2023DG Regio talk contribs 80,842 bytes +11,792 Changed label, description and/or aliases in it, da, sk, ga, et, fi, de, bg, hr, lv, es, pt, cs, fr, nl, hu, ro, lt, sl, el, mt, sv, and other parts

20 October 2022

27 July 2022

  • curprev 14:1014:10, 27 July 2022DG Regio talk contribs 68,236 bytes +39,988 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 17,082 bytes +2,781 Created claim: summary (P836): Le projet consiste en la thermomodernisation de la construction du complexe scolaire no 2 avec les sections d’intégration à Hajnówka. En raison des très mauvais paramètres d’isolation thermique combinés à l’approvisionnement en chaleur d’une chaufferie équipée d’une chaudière produite avant 1980, les travaux de construction suivants ont été prévus: * réchauffement des murs de fondation souterrains; * réchauffement des parois extérieures du polys...
  • curprev 06:3306:33, 2 December 2021DG Regio talk contribs 14,301 bytes +169 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:1915:19, 20 October 2020DG Regio talk contribs 14,571 bytes +154 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1915:19, 20 October 2020DG Regio talk contribs 14,417 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1915:19, 20 October 2020DG Regio talk contribs 14,550 bytes +1,948 Created claim: summary (P836): The project consists of the thermal modernisation of School Complex No. 2 with Integration Divisions in Hajnówka. Due to the very poor thermal insulation parameters combined with heat supply of the facility from a coal boiler room equipped with boilers produced before 1980, and thus very low energy efficiency of the building, the following construction works are planned: * warming of the underground foundation walls; * power of the interior wall...
  • curprev 15:1915:19, 20 October 2020DG Regio talk contribs 12,602 bytes −1,880 Removed claim: summary (P836): The project consists of the thermal renovation of the Team of School Building No 2 of the Integrated Departments in Hajnówka. Due to very poor thermal insulation parameters in combination with a coal-fired boiler equipped with a boiler equipped with a boiler well before 1980, and therefore the very low energy efficiency of the building, the following construction works were planned: * insulation of fundamental walls; * insulation of the sides...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:4008:40, 10 March 2020DG Regio talk contribs 12,761 bytes +1,880 Created claim: summary (P836): The project consists of the thermal renovation of the Team of School Building No 2 of the Integrated Departments in Hajnówka. Due to very poor thermal insulation parameters in combination with a coal-fired boiler equipped with a boiler equipped with a boiler well before 1980, and therefore the very low energy efficiency of the building, the following construction works were planned: * insulation of fundamental walls; * insulation of the sides of...

24 February 2020

18 February 2020

31 January 2020

14 January 2020