11 October 2024

  • curprev 04:0304:03, 11 October 2024DG Regio talk contribs 88,888 bytes 0 Changed label, description and/or aliases in pt
  • curprev 04:0304:03, 11 October 2024DG Regio talk contribs 88,888 bytes −6 Set a claim value: summary (P836): O principal objetivo do projeto é lançar a produção de eletricidade a partir de uma fonte renovável de energia solar e, em seguida, introduzi-la na rede elétrica, afetando assim o aumento da quota de produção distribuída de energia a partir de fontes renováveis. O projeto tem por objeto a construção de uma central fotovoltaica com uma capacidade de 1,75 MW em Giełczyn. O investimento consiste na montagem de 5309 unidades de painéis fotovoltaicos (po...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

20 October 2022

2 July 2022

  • curprev 17:0817:08, 2 July 2022DG Regio talk contribs 83,186 bytes +53,067 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:4106:41, 2 December 2021DG Regio talk contribs 18,110 bytes +3,027 Created claim: summary (P836): L’objectif principal du projet est de lancer la production d’électricité à partir d’une source d’énergie renouvelable à partir du soleil, puis de l’introduire dans le réseau électrique, contribuant ainsi à une part accrue de la production distribuée d’énergie à partir de sources renouvelables. L’objet du projet est la construction d’une centrale photovoltaïque de 1,75 MW à Giełczyn. L’investissement consiste à assembler 5309 panneaux photovoltaï...
  • curprev 06:4106:41, 2 December 2021DG Regio talk contribs 15,083 bytes +116 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:0515:05, 20 October 2020DG Regio talk contribs 15,406 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0415:04, 20 October 2020DG Regio talk contribs 15,295 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0415:04, 20 October 2020DG Regio talk contribs 15,408 bytes +2,685 Created claim: summary (P836): The main objective of the project is to launch the production of electricity based on a renewable source of energy from the sun and then introduce it into the electricity grid, thus affecting the increased share of distributed production of energy from renewable sources. The object of the project is the construction of a photovoltaic power plant with a capacity of 1.75 MW in Giełczyn. The investment consists of mounting 5309 units of photovoltai...
  • curprev 15:0415:04, 20 October 2020DG Regio talk contribs 12,723 bytes −2,194 Removed claim: summary (P836): The main objective of the project is to mobilise the production of electricity on the basis of a renewable source of energy from the sun and then introduce it into the electricity grid, thus contributing to the increased share of distributed production of energy from renewable sources. The project is based on the construction of a 1.75 MW photovoltaic power plant in the line. The investment consists of the installation of 5309 solar panels (po...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3308:33, 10 March 2020DG Regio talk contribs 13,201 bytes +2,194 Created claim: summary (P836): The main objective of the project is to mobilise the production of electricity on the basis of a renewable source of energy from the sun and then introduce it into the electricity grid, thus contributing to the increased share of distributed production of energy from renewable sources. The project is based on the construction of a 1.75 MW photovoltaic power plant in the line. The investment consists of the installation of 5309 solar panels (poly...

24 February 2020

18 February 2020

31 January 2020