9 October 2024

  • curprev 06:2206:22, 9 October 2024DG Regio talk contribs 89,200 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:2206:22, 9 October 2024DG Regio talk contribs 89,200 bytes −17 Set a claim value: summary (P836): O projeto tem por objeto um investimento que envolve a construção de uma central fotovoltaica com uma capacidade máxima de 0,89991 MW. O projeto executa o objetivo específico: Aumento da quota de produção distribuída de energias renováveis Medidas 5.1 RPOWP. A execução do projeto contribuirá para aumentar a quota de energias renováveis na produção total de energia. O resultado da aplicação das medidas será a redução das emissões de CO2 e a melhoria...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4619:46, 2 March 2023DG Regio talk contribs 86,459 bytes −858 Changed label, description and/or aliases in sk, lv, da, bg, ga, et, fi, ro, sv, nl, lt, es, pt, sl, hu, de, cs, el, hr, mt, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 17:0517:05, 2 July 2022DG Regio talk contribs 85,663 bytes +55,509 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

2 December 2021

  • curprev 06:4006:40, 2 December 2021DG Regio talk contribs 18,102 bytes +3,036 Created claim: summary (P836): Le projet concerne un investissement consistant en la construction d’une centrale photovoltaïque d’une capacité maximale de 0,89991 MW. Le projet met en œuvre l’objectif spécifique: Augmentation de la part de la production d’énergie renouvelable distribuée Mesure 5.1 ROPWP. La mise en œuvre du projet contribuera à accroître la part des énergies renouvelables dans la production totale d’énergie. La mise en œuvre des mesures entraînera une réducti...
  • curprev 06:4006:40, 2 December 2021DG Regio talk contribs 15,066 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 15,378 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 15,256 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 15,380 bytes +2,725 Created claim: summary (P836): The subject of the project is an investment involving the construction of a photovoltaic power plant with a capacity of up to 0,89991 MW. The project implements the specific objective: Increased share of distributed renewable energy production Measures 5.1 RPOWP. The implementation of the project will contribute to increasing the share of renewable energy in total energy production. The result of the implementation of the measures will be to red...
  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 12,655 bytes −2,187 Removed claim: summary (P836): The project consists of an investment in the construction of a PV power plant of up to 0.89991 MW. The project is directly implementing the specific objective: Increased share of distributed production of energy from renewable sources Measure 5.1 RPOWP. The project will contribute to increasing the share of renewable energy in total energy production. The effect of the measures will be to reduce CO2 emissions and improve the environment, but a...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 13,124 bytes +2,187 Created claim: summary (P836): The project consists of an investment in the construction of a PV power plant of up to 0.89991 MW. The project is directly implementing the specific objective: Increased share of distributed production of energy from renewable sources Measure 5.1 RPOWP. The project will contribute to increasing the share of renewable energy in total energy production. The effect of the measures will be to reduce CO2 emissions and improve the environment, but als...

25 February 2020

18 February 2020

31 January 2020

14 January 2020