Revision history of "RES installations for PGK’s own needs in Seine" (Q116830)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 85,654 bytes −3 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 85,657 bytes +9 Set a claim value: summary (P836): O projeto prevê a criação de uma central fotovoltaica e de uma sala de caldeiras a biomassa para as necessidades próprias do edifício administrativo da empresa PGK em Sejna (estação de tratamento de águas residuais de Marynów). A partir de hoje, toda a energia consumida pela empresa provém de fontes convencionais. O objetivo geral do projeto é reduzir os custos da eletricidade consumida. Atualmente, as contas de eletricidade ascendem a mais de 160 m...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4619:46, 2 March 2023DG Regio talk contribs 83,251 bytes −142 Changed label, description and/or aliases in it, da, sk, lv, el, sv, et, pt, fr, fi, hr, ga, cs, de, hu, mt, lt, ro, bg, es, sl, nl, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 17:0517:05, 2 July 2022DG Regio talk contribs 81,290 bytes +52,424 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 16,960 bytes +2,999 Created claim: summary (P836): Le projet prévoit la création d’une installation photovoltaïque et d’une chaudière à biomasse produisant de l’énergie pour répondre aux besoins propres du bâtiment administratif de la société PGK à Sejny (zone de la station d’épuration des eaux usées de Marynów). À ce jour, toute l’énergie consommée par l’entreprise provient de sources conventionnelles. L’objectif général du projet est de réduire le coût de l’électricité consommée. Actuellement,...
  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 13,961 bytes +110 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 14,290 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 14,183 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 14,296 bytes +2,628 Created claim: summary (P836): The project envisages the creation of a photovoltaic plant and a biomass boiler room for the own needs of the administrative building of the PGK company in Sejna (the waste water treatment plant in Marynów). As of today, all the energy consumed by the company comes from conventional sources. The overall objective of the project is to reduce the costs of electricity consumed. Currently, electricity bills amount to over 160 thousand zlotys per yea...
  • curprev 15:5715:57, 20 October 2020DG Regio talk contribs 11,668 bytes −2,172 Removed claim: summary (P836): The project provides for the installation of a photovoltaic installation and a boiler for the biomass producing energy for the yard’s own administrative building in Sejny (wastewater treatment plant at the Navy). Today, all the energy collected by the company comes from conventional sources. The general objective of the project is to reduce the cost of electricity. Currently, current bills amount to more than PLN 160 per year, which is a major...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 12,554 bytes +2,172 Created claim: summary (P836): The project provides for the installation of a photovoltaic installation and a boiler for the biomass producing energy for the yard’s own administrative building in Sejny (wastewater treatment plant at the Navy). Today, all the energy collected by the company comes from conventional sources. The general objective of the project is to reduce the cost of electricity. Currently, current bills amount to more than PLN 160 per year, which is a major f...

25 February 2020

18 February 2020

31 January 2020

14 January 2020