Revision history of "Systems for the use of renewable energy sources in the Mielnik Municipality" (Q116813)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

20 October 2022

5 September 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3620:36, 1 December 2021DG Regio talk contribs 17,557 bytes +2,935 Created claim: summary (P836): Projet: «Systèmes d’utilisation de sources d’énergie renouvelables dans la municipalité de Mieelnik» désigne la construction de deux installations photovoltaïques: — sur la clôture de la Sports Orlica à Mielnik avec une puissance de 10 kW (10,98 kWp), — sur le toit du bâtiment du complexe scolaire de Mielnik d’une puissance de 25 kW (27,45 kWp), ainsi que la construction d’une seule installation solaire sur le toit du bâtiment du complexe scolai...
  • curprev 20:3620:36, 1 December 2021DG Regio talk contribs 14,622 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,934 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,800 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,913 bytes +2,521 Created claim: summary (P836): Project titled: ‘Renewable energy systems in the Mielnik Municipality’ refers to the construction of two photovoltaic installations: — on the fence of Sports Orlik in Mielnik with a power of 10 kW (10.98 kWp), – on the roof of the building of the School Complex in Mielnik with a power of 25 kW (27.45 kWp), as well as the construction of one solar installation on the roof of the School Complex building in Mieelnik with a power of 3,9 kW. The task...
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 12,392 bytes −2,073 Removed claim: summary (P836): The project, which is entitled “Renewable energy systems in the municipality of Mielec” relate to the construction of two photovoltaic installations: — 10 kW (10,98 kWp) of the sports eagle garden in Mielnik, on the roof of a building group in Mielec with a power of 25 kW (27,45 kWp), as well as the construction of one solar installation on the roof of the Team of Schools in Mielnik, with a power of 3.9 kW. The photovoltaic installation will b...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 12,762 bytes +2,073 Created claim: summary (P836): The project, which is entitled “Renewable energy systems in the municipality of Mielec” relate to the construction of two photovoltaic installations: — 10 kW (10,98 kWp) of the sports eagle garden in Mielnik, on the roof of a building group in Mielec with a power of 25 kW (27,45 kWp), as well as the construction of one solar installation on the roof of the Team of Schools in Mielnik, with a power of 3.9 kW. The photovoltaic installation will be...

25 February 2020

18 February 2020

31 January 2020

14 January 2020