Revision history of "Renewable energy sources in Independent Public Health Care Department in Sokółka ETAP I" (Q116811)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4619:46, 2 March 2023DG Regio talk contribs 77,263 bytes −1,889 Changed label, description and/or aliases in it, lv, sk, da, fi, fr, et, hu, pt, cs, sl, ga, ro, lt, bg, hr, nl, es, mt, sv, el, de, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 17:0417:04, 2 July 2022DG Regio talk contribs 77,493 bytes +49,304 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3620:36, 1 December 2021DG Regio talk contribs 17,090 bytes +2,641 Created claim: summary (P836): Le sujet de l’étude est une centrale photovoltaïque de phase 1 destinée à la production d’électricité fonctionnant en parallèle avec le réseau de distribution de l’industrie de l’électricité commerciale d’une capacité de 37,8 kWp. L’électricité produite sera utilisée pour son propre usage et la production excédentaire sera injectée dans le réseau de distribution. Date prévue de mise en œuvre du projet: Septembre 2017 L’objectif principal du proj...
  • curprev 20:3620:36, 1 December 2021DG Regio talk contribs 14,449 bytes +162 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,726 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,578 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,711 bytes +2,409 Created claim: summary (P836): The subject of the study is a photovoltaic power plant Stage 1 designed for the production of electricity operating in parallel with the distribution network of professional energy with a capacity of 37.8 kWp. The electricity produced will be used for own use, the excess production will be transferred to the distribution network. Planned date of implementation of the project: September 2017 The main objective of the project is to generate electr...
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 12,302 bytes −1,907 Removed claim: summary (P836): The study is a photovoltaic power plant 1 designed for the production of electricity at the same time as the 37,8kWp power distribution network. The electricity produced will be used for own account, the surplus production will be fed into the distribution network. Planned date of implementation of the project: September 2017 The main project for the project is the production of electricity from RES for its own hospital, which will reduce CO2-...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 12,489 bytes +1,907 Created claim: summary (P836): The study is a photovoltaic power plant 1 designed for the production of electricity at the same time as the 37,8kWp power distribution network. The electricity produced will be used for own account, the surplus production will be fed into the distribution network. Planned date of implementation of the project: September 2017 The main project for the project is the production of electricity from RES for its own hospital, which will reduce CO2-em...

25 February 2020

18 February 2020

31 January 2020

14 January 2020