Revision history of "Energy from renewable sources in PPHU Marcin Garden" (Q116792)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 75,257 bytes −4 Changed label, description and/or aliases in pt
  • curprev 04:0204:02, 11 October 2024DG Regio talk contribs 75,261 bytes −111 Set a claim value: summary (P836): O projeto diz respeito a investimentos na construção de duas novas unidades de produção de eletricidade com uma capacidade de 32,1 kW e 37,8 kW com ligação à rede de distribuição/transporte de acordo com a documentação técnica. Data prevista para a execução do projeto: Abril 2019 O principal objetivo do projeto é gerar eletricidade a partir de FER para as necessidades próprias da empresa, o que permitirá reduzir as emissões de CO2. Este objetivo ser...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4619:46, 2 March 2023DG Regio talk contribs 72,614 bytes +759 Changed label, description and/or aliases in lv, ro, it, da, fr, es, cs, et, sk, fi, lt, de, hu, sv, bg, hr, sl, nl, pt, el, mt, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 17:0417:04, 2 July 2022DG Regio talk contribs 70,185 bytes +43,837 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 16,328 bytes +2,413 Created claim: summary (P836): Le projet concerne des investissements dans la construction de 2 nouvelles unités de production d’électricité d’une capacité de 32,1 kW et de 37,8 kW raccordées au réseau de distribution/transmission conformément à la documentation technique. Date prévue de mise en œuvre du projet: Avril 2019. L’objectif principal du projet est de produire de l’électricité à partir de SER pour les besoins propres de l’entreprise, ce qui permettra de réduire les...
  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 13,915 bytes +104 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,250 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,140 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,254 bytes +2,192 Created claim: summary (P836): The project concerns investments in the construction of 2 new units of electricity generation with a capacity of 32,1 kW and 37,8 kW with connection to the distribution/transmission network according to the technical documentation. Planned date of implementation of the project: April 2019 The main objective of the project is to generate electricity from RES for the company’s own needs, which will allow to reduce CO2 emissions.This objective will...
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 12,062 bytes −1,618 Removed claim: summary (P836): The project concerns the investment in the construction of 2 new electricity generation units with a power of 32.1 kW and 37.8 kW with connections to the distribution/transmission network in accordance with the technical documentation. Planned date of implementation of the project: April 2019 The main objective of the project is the production of electricity from RES for its own needs, which will allow CO2-emissions to be reduced. this objecti...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 11,955 bytes +1,618 Created claim: summary (P836): The project concerns the investment in the construction of 2 new electricity generation units with a power of 32.1 kW and 37.8 kW with connections to the distribution/transmission network in accordance with the technical documentation. Planned date of implementation of the project: April 2019 The main objective of the project is the production of electricity from RES for its own needs, which will allow CO2-emissions to be reduced. this objective...

25 February 2020

18 February 2020

31 January 2020

14 January 2020