Revision history of "GREEN ENERGY IN THE COMPANY SERVICE COMPANY ESAM ANASTAZJA HANNA SIENICKA" (Q116791)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 71,538 bytes −20 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 71,558 bytes +57 Set a claim value: summary (P836): Em resultado da execução do projeto, o candidato disporá de uma instalação e equipamento de produção de eletricidade a partir de energia solar de 25,62 kWp. Data prevista de implementação do projecto Maio-Julho 2019 O principal objectivo do projecto é gerar electricidade a partir de FER para as próprias necessidades da empresa, o que permitirá reduzir as emissões de CO2. Este objectivo será realizado através da instalação de dispositivos que permita...

12 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4619:46, 2 March 2023DG Regio talk contribs 67,966 bytes −1,928 Changed label, description and/or aliases in da, sk, it, ro, es, fi, et, ga, cs, sv, lt, fr, el, nl, bg, hu, de, mt, pt, hr, sl, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 17:0417:04, 2 July 2022DG Regio talk contribs 68,222 bytes +42,491 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 16,059 bytes +2,269 Created claim: summary (P836): À la suite de la mise en œuvre du projet, la requérante disposera d’une installation et d’un équipement pour produire de l’électricité à partir de l’énergie solaire de 25,62 kWc. Date prévue de mise en œuvre du projet de mai à juillet 2019. L’objectif principal du projet mis en œuvre est de produire de l’électricité à partir de SER pour les besoins propres de l’entreprise, ce qui permettra de réduire les émissions de CO2. Cet objectif sera attei...
  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 13,790 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,084 bytes +132 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 13,952 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 14,075 bytes +2,086 Created claim: summary (P836): As a result of the implementation of the project, the applicant will have an installation and equipment producing electricity using solar energy of 25,62 kWp. Planned date of implementation of the project May-July 2019 The main objective of the project is to generate electricity from RES for the own needs of the company, which will allow to reduce CO2 emissions.This objective will be realised by installing devices allowing the production of ener...
  • curprev 15:5615:56, 20 October 2020DG Regio talk contribs 11,989 bytes −1,461 Removed claim: summary (P836): As a result of the project, the applicant will have an installation and equipment producing electricity using solar radiation of 25,62 kWp. The planned date for the implementation of the May-July 2019 project. The main objective of the project is the production of electricity from RES for the company’s own needs, which will allow CO2-emissions to be reduced. this objective will be achieved through the installation of equipment for the producti...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 11,736 bytes +1,461 Created claim: summary (P836): As a result of the project, the applicant will have an installation and equipment producing electricity using solar radiation of 25,62 kWp. The planned date for the implementation of the May-July 2019 project. The main objective of the project is the production of electricity from RES for the company’s own needs, which will allow CO2-emissions to be reduced. this objective will be achieved through the installation of equipment for the production...

25 February 2020

18 February 2020

31 January 2020

14 January 2020