Revision history of "Green energy sources for public buildings in Puńsk Municipality" (Q116775)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 90,147 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 90,145 bytes −44 Set a claim value: summary (P836): Tipo de projecto 2: Energia baseada em fontes de energia renováveis. O projeto prevê a construção de infraestruturas que serão utilizadas para a produção de eletricidade e calor a partir de FER. Serão instalações solares e 3 instalações fotovoltaicas. O projeto será executado no município de Puńsk, que é uma comunidade rural. O investimento abrangerá três edifícios públicos. A potência dos sistemas solares e fotovoltaicos planeados foi selecionada c...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

3 November 2022

25 October 2022

20 October 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3520:35, 1 December 2021DG Regio talk contribs 18,299 bytes +3,107 Created claim: summary (P836): Type de projet 2: Les énergies renouvelables. Le projet prévoit la construction d’infrastructures qui seront utilisées pour la production d’électricité et de chaleur à partir des SER. Il s’agira d’une installation solaire et de 3 installations photovoltaïques. Le projet sera mis en œuvre dans la municipalité de Puńsk, commune rurale. L’investissement couvrira 3 bâtiments publics. La puissance des systèmes photovoltaïques et solaires prévus a été...
  • curprev 20:3520:35, 1 December 2021DG Regio talk contribs 15,192 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 15,489 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 15,366 bytes −111 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 15,477 bytes +2,751 Created claim: summary (P836): Type of project 2: Energy based on renewable energy sources. The project envisages the construction of infrastructure which will be used for the production of electricity and heat from RES. It will be solar installation and 3 photovoltaic installations. The project will be implemented in the municipality of Puńsk, which is a rural community. The investment will cover 3 public buildings. The power of the planned solar and photovoltaic systems was...
  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 12,726 bytes −2,274 Removed claim: summary (P836): Project Type No 2: Energy based on renewable energy sources. The project envisages the construction of infrastructure which will be used for the production of electricity and heat from RES. It will be a solar installation and 3 photovoltaic installations. The project will be implemented in the commune of Puńsk, which is a rural municipality. 3 public buildings will be covered by the investment. The capacity of the planned solar and solar syste...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3508:35, 10 March 2020DG Regio talk contribs 13,288 bytes +2,274 Created claim: summary (P836): Project Type No 2: Energy based on renewable energy sources. The project envisages the construction of infrastructure which will be used for the production of electricity and heat from RES. It will be a solar installation and 3 photovoltaic installations. The project will be implemented in the commune of Puńsk, which is a rural municipality. 3 public buildings will be covered by the investment. The capacity of the planned solar and solar systems...

25 February 2020

18 February 2020

31 January 2020

14 January 2020