Revision history of "Reduction of electricity costs in Polna Dmochowska by purchasing a photovoltaic installation" (Q116755)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 78,127 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 78,127 bytes −3 Set a claim value: summary (P836): O projeto é executado por um projeto fixo e situar-se-á nas instalações da unidade de produção da padaria (parte 3/1, ul. Ciechanowiecka, n.o 16, 18-220 Czyżew). O investimento durará de novembro de 2018 até ao final de dezembro de 2018 e o seu valor total ascenderá a 215 217,84 PLN brutos. O projecto consistirá na aquisição e instalação de uma instalação fotovoltaica com uma potência de 39.865 kWp. A instalação incluirá o custo de aquisição de pain...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1819:18, 2 March 2023DG Regio talk contribs 74,595 bytes +817 Changed label, description and/or aliases in da, cs, ga, fi, et, hr, ro, es, sl, sv, el, fr, de, mt, lt, nl, bg, hu, pt, lv, it, sk, and other parts

25 October 2022

20 October 2022

27 July 2022

  • curprev 14:0614:06, 27 July 2022DG Regio talk contribs 72,108 bytes +45,379 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3820:38, 1 December 2021DG Regio talk contribs 16,691 bytes +2,476 Created claim: summary (P836): Le projet est mis en œuvre par un projet stationnaire et sera situé dans les locaux de l’usine de production de la boulangerie (parc 3/1, ul. Ciechanowiecka, no 16, 18-220 Czyżew). L’investissement durera de novembre 2018 à fin décembre 2018 et sa valeur totale sera de 215 217,84 PLN brut. Le projet consistera en l’achat et l’installation d’une installation photovoltaïque d’une puissance de 39 865 kWc. La portée de l’installation comprendra le c...
  • curprev 20:3820:38, 1 December 2021DG Regio talk contribs 14,215 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 14,483 bytes +151 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 14,332 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 14,494 bytes +2,214 Created claim: summary (P836): The project is carried out by a stationary project and will be located on the premises of the bakery’s production plant (part 3/1, ul. Ciechanowiecka, No. 16, 18-220 Czyżew). The investment will last from November 2018 until the end of December 2018 and its total value will amount to PLN 215 217.84 gross. The project will consist of the purchase and installation of a photovoltaic installation with a power of 39.865 kWp. The installation will inc...
  • curprev 15:5515:55, 20 October 2020DG Regio talk contribs 12,280 bytes −1,660 Removed claim: summary (P836): The project is based on a fixed project and will be located on the premises of the bakery shop (parcel 3/1, ul. Ciechanics, No. 16, 18-220 Czyżew). The investment will run from November 2018 to the end of December 2018, with a total value of PLN 215 217,84 gross. The project will consist of the purchase and installation of 39,865 kWp. The installation will cover the cost of buying panels, structures, pipes, inverters, switchgear, protection ag...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0212:02, 9 March 2020DG Regio talk contribs 12,228 bytes +1,660 Created claim: summary (P836): The project is based on a fixed project and will be located on the premises of the bakery shop (parcel 3/1, ul. Ciechanics, No. 16, 18-220 Czyżew). The investment will run from November 2018 to the end of December 2018, with a total value of PLN 215 217,84 gross. The project will consist of the purchase and installation of 39,865 kWp. The installation will cover the cost of buying panels, structures, pipes, inverters, switchgear, protection agai...

24 February 2020

18 February 2020

31 January 2020

14 January 2020