Revision history of "Revitalisation of railway line No 59 on the national border section – Chryzanów (S)’" (Q116738)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 83,967 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 83,964 bytes +55 Set a claim value: summary (P836): O projeto tem por objeto os trabalhos de conceção e de revitalização da linha ferroviária de via única, de via larga não eletrificada (1520 mm), n.o 59, no troço entre o km 0,000 e o km 20.132, juntamente com dispositivos de controlo do tráfego, engenharia de energia elétrica, telecomunicações, interseções num nível de estradas e linhas ferroviárias e instalações de engenharia. O troço Skupowo – Chryzanów, em km 20.132-27.155, não está atualmente in...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4619:46, 2 March 2023DG Regio talk contribs 79,599 bytes −714 Changed label, description and/or aliases in da, it, sk, fi, cs, el, fr, sv, et, de, bg, ga, es, lv, pt, lt, hu, ro, hr, sl, nl, mt, and other parts

25 October 2022

20 October 2022

27 September 2022

2 July 2022

  • curprev 17:0217:02, 2 July 2022DG Regio talk contribs 77,441 bytes +48,807 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 18,011 bytes +2,593 Created claim: summary (P836): Le projet porte sur la conception et la revitalisation de la ligne de chemin de fer à voie unique, non électrifiée et à large écartement (1 520 mm) no 59, entre les km 0,000 et 20.132, ainsi que sur le contrôle du trafic ferroviaire, l’électricité, les télécommunications, les intersections sur un niveau de routes et de lignes ferroviaires et les installations techniques. La section Skupowo-Chryzanów au km 20.132-27.155 n’est actuellement pas dan...
  • curprev 20:3720:37, 1 December 2021DG Regio talk contribs 15,418 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:4015:40, 20 October 2020DG Regio talk contribs 15,708 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4015:40, 20 October 2020DG Regio talk contribs 15,560 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4015:40, 20 October 2020DG Regio talk contribs 15,723 bytes +2,457 Created claim: summary (P836): The subject of the project are design works and revitalisation of single track, non-electrified wide track (1520 mm) railway line No. 59 in the section from km 0.000 to km 20.132, together with traffic control devices, electric power engineering, telecommunications, intersections in one level of roads and railway lines and engineering facilities. The section Skupowo – Chryzanów in km 20.132-27.155 is currently not included in the management of P...
  • curprev 15:4015:40, 20 October 2020DG Regio talk contribs 13,266 bytes −1,974 Removed claim: summary (P836): The project involves design work and the renovation of one gauge, non-electrified, wide gauge (1 520 mm) of railway line number 59 from km 0,000 to km 20,132 with traffic control units, electric power, telecommunication, road junctions at one road and railway line level and engineering structures. The Skupowo — Chrysanthemums segment in km 20,132-27,155 is currently not in charge of PKP PLK S.A., the category of line 59 — secondary. The whole...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0212:02, 9 March 2020DG Regio talk contribs 13,110 bytes +1,974 Created claim: summary (P836): The project involves design work and the renovation of one gauge, non-electrified, wide gauge (1 520 mm) of railway line number 59 from km 0,000 to km 20,132 with traffic control units, electric power, telecommunication, road junctions at one road and railway line level and engineering structures. The Skupowo — Chrysanthemums segment in km 20,132-27,155 is currently not in charge of PKP PLK S.A., the category of line 59 — secondary. The whole su...

24 February 2020

18 February 2020

31 January 2020

14 January 2020