Revision history of "A three-year-old with a future." (Q116322)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 88,618 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 88,616 bytes −7 Set a claim value: summary (P836): O jardim de infância compromete-se a preservar a durabilidade de 25 lugares criados no âmbito do projeto.Apresentar durante um período de, pelo menos, dois anos a contar da data de conclusão do pressuposto do projeto: — criação de 25 lugares para crianças de 3 anos, adaptando 1 mistura no PP n.o 14 em Łomża — equipando 1 jardim de infância com 5 parques infantis. —ajustamento de 1 entradas na vedação e 1 linha de comunicação para crianças com defici...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

27 July 2022

  • curprev 13:5813:58, 27 July 2022DG Regio talk contribs 81,721 bytes +51,943 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:4520:45, 1 December 2021DG Regio talk contribs 17,886 bytes +3,003 Created claim: summary (P836): La maternelle s’engage à maintenir la durabilité des 25 places créées dans le cadre du projet pendant une période d’au moins 2 ans à compter de la date d’achèvement de l’établissement du projet: —création de 25 places pour enfants de 3 ans en adaptant 1 chambre dans le PP no 14 à Łomża — réaménagement d’un jardin préscolaire avec 5 équipements de jeu. —ajuster 1 entrée dans la clôture et 1 itinéraire de transport pour un enfant handicapé. — équi...
  • curprev 20:4520:45, 1 December 2021DG Regio talk contribs 14,883 bytes +97 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:0915:09, 20 October 2020DG Regio talk contribs 15,225 bytes +90 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0915:09, 20 October 2020DG Regio talk contribs 15,135 bytes −87 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0915:09, 20 October 2020DG Regio talk contribs 15,222 bytes +2,681 Created claim: summary (P836): The kindergarten undertakes to preserve the durability of 25 places created within the project.Present for a period of at least 2 years from the date of completion of the project’s project assumption: — creation of 25 seats for 3-year-old children by adapting 1 mixes in PP No. 14 in Łomża – equipping 1 kindergarten garden with 5 playgrounds. —adjustment of 1 entrances in the fence and 1 communication lines for disabled children. — Equipment of 1...
  • curprev 15:0915:09, 20 October 2020DG Regio talk contribs 12,541 bytes −2,359 Removed claim: summary (P836): The pre-school shall be committed to maintaining the stability created by the project of the 25 places raised in the project for a period of at least 2 years from the date the project is concluded with the project: The creation of 25 places for 3 summer children through the adaptation of 1 times in PP 14 to the Łomża — providing 1 children with pre-school provision in 5 toy devices. Adjust the 1 fence entrances and 1 communication lines for th...

17 July 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5411:54, 9 March 2020DG Regio talk contribs 13,174 bytes +2,359 Created claim: summary (P836): The pre-school shall be committed to maintaining the stability created by the project of the 25 places raised in the project for a period of at least 2 years from the date the project is concluded with the project: The creation of 25 places for 3 summer children through the adaptation of 1 times in PP 14 to the Łomża — providing 1 children with pre-school provision in 5 toy devices. Adjust the 1 fence entrances and 1 communication lines for the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020