Revision history of "System of interconnected two-column lifts using an integrated system of operation and control of water lifts" (Q11597)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 52,394 bytes +5 Changed label, description and/or aliases in pt
  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 52,389 bytes +4 Set a claim value: summary (P836): O objetivo do projeto é pesquisar e desenvolver um novo sistema de elevadores interligados de duas colunas utilizando um sistema integrado de automação de operação e controlo de elevadores de água. Isto representa uma outra e completamente nova fase de desenvolvimento seguindo o actual conceito de operação de vários elevadores de água de duas colunas do utilizador. A introdução deste conceito completamente novo de operação do complexo traz muitas va...

22 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 16:4616:46, 2 July 2022DG Regio talk contribs 49,203 bytes +28,789 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

3 December 2021

2 December 2021

  • curprev 09:1509:15, 2 December 2021DG Regio talk contribs 15,997 bytes +1,366 Created claim: summary (P836): Ziel des Projekts ist die Erforschung und Entwicklung eines neuen Systems miteinander verbundener Zweisäulenaufzüge unter Verwendung eines integrierten Systems der Automatisierung des Betriebs und des Managements von Wasseraufzügen. Es stellt eine weitere und völlig neue Entwicklungsphase nach dem aktuellen Konzept des Betriebs mehrerer zweispaltiger Wasseraufzüge des Anwenders dar. Die Einführung dieses brandneuen Betriebskonzepts des Komplexes...
  • curprev 09:1509:15, 2 December 2021DG Regio talk contribs 14,631 bytes +194 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:1909:19, 28 November 2021DG Regio talk contribs 14,437 bytes +1,424 Created claim: summary (P836): L’objectif du projet est de rechercher et de développer un nouveau système d’ascenseurs interconnectés à deux colonnes utilisant un système intégré d’automatisation de l’exploitation et de la gestion des ascenseurs à eau. Il représente une autre étape de développement complètement nouvelle suivant le concept actuel d’exploitation de plusieurs ascenseurs à eau à deux colonnes de l’utilisateur. L’introduction de ce tout nouveau concept d’exploitat...
  • curprev 09:1909:19, 28 November 2021DG Regio talk contribs 13,013 bytes +224 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:1915:19, 22 October 2020DG Regio talk contribs 13,238 bytes +1,305 Created claim: summary (P836): The aim of the project is to research and develop a new system of interconnected two-column lifts using an integrated system of operation automation and water lift control. This represents another and completely new development stage following the current concept of operation of several two-column water lifts of the user. The introduction of this completely new concept of operation of the complex brings many advantages for the operator of the li...
  • curprev 15:1915:19, 22 October 2020DG Regio talk contribs 11,933 bytes −876 Removed claim: summary (P836): The objective of the project is research and development of a new system of combined-mounted paddleplines using an integrated system for the operation and management of water lifts. This constitutes an additional and completely new development stage, building on the current concept of the operation of more than two lube waterlift lines of the user. The introduction of this completely new concept of site operation offers many advantages both fo...
  • curprev 06:4206:42, 22 October 2020DG Regio talk contribs 12,809 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:4206:42, 22 October 2020DG Regio talk contribs 12,641 bytes −187 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 07:4207:42, 26 February 2020DG Regio talk contribs 11,552 bytes +876 Created claim: summary (P836): The objective of the project is research and development of a new system of combined-mounted paddleplines using an integrated system for the operation and management of water lifts. This constitutes an additional and completely new development stage, building on the current concept of the operation of more than two lube waterlift lines of the user. The introduction of this completely new concept of site operation offers many advantages both for...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020