Revision history of "IMPROVING THE EFFICIENCY OF MEDICAL SERVICES IN THE DISTRICT HOSPITAL IN STRZELCE OPOLSKIE BY MODERNISING THE INTERNAL BRANCH WITH THE SUPPLY OF EQUIPMENT" (Q115666)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1818:18, 9 October 2024DG Regio talk contribs 96,879 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:1818:18, 9 October 2024DG Regio talk contribs 96,880 bytes −118 Set a claim value: summary (P836): O tema do projeto será moderno. e aquisição de equipamentos para a Odd. I.A.S. (O equipamento é por sua vez. 5. 8 quartos terão acesso às suas próprias casas de banho, os restantes 5 quartos terão acesso a até quatro casas de banho públicas. 2 quartos individuais poderão servir como salas de isolamento. A estação estará localizada no 1o andar – o 3o andar, porque até agora duas seções estavam no 3o e 2o andar. As obras de construção serão realizadas...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

22 October 2022

2 July 2022

  • curprev 16:4016:40, 2 July 2022DG Regio talk contribs 89,751 bytes +57,694 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:2320:23, 1 December 2021DG Regio talk contribs 18,755 bytes +3,156 Created claim: summary (P836): Le sujet du projet sera moderne. et l’achat d’équipement sur Odd. I.D. (l’équipement est inclus. 5). 8 chambres auront accès à leurs propres salles de bains, les 5 autres auront accès à quatre salles de bains publiques. 2 salles individuelles seront en mesure d’effectuer la fonction d’isolats.Deuxièmement il sera situé au 1er niveau — 3ème étage, puisque jusqu’à présent deux sections ont été situées au 3ème et 2ème étage. Les travaux de construc...
  • curprev 20:2320:23, 1 December 2021DG Regio talk contribs 15,599 bytes +230 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:3712:37, 20 October 2020DG Regio talk contribs 15,810 bytes +216 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:3712:37, 20 October 2020DG Regio talk contribs 15,594 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:3712:37, 20 October 2020DG Regio talk contribs 15,827 bytes +2,834 Created claim: summary (P836): The subject of the project will be modern. and purchase of equipment for Odd. I.A.S. (Equipment is in turn. 5. 8 rooms will have access to their own bathrooms, the remaining 5 rooms will have access to up to four public bathrooms. 2 single rooms will be able to serve as isolation rooms.The station will be located on the 1st level – the 3rd floor, because so far two sections were on the 3rd and 2nd floor. Construction works will take place under...
  • curprev 12:3712:37, 20 October 2020DG Regio talk contribs 12,993 bytes −2,349 Removed claim: summary (P836): The object of the project will be the purchase of equipment and equipment for the Oder. Inside (the equipment is enclosed. EUR 5). 8 rooms will have access to their own bathroom, the remaining 5 rooms will have access to four bathrooms. 2 one-person rooms will be able to perform the function of Isolatex, and will be located on the 1-3 floor, as the two sections so far have been on the 3th and 2th floor. The construction works will be carried o...

25 September 2020

24 September 2020

17 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:3308:33, 10 March 2020DG Regio talk contribs 13,626 bytes +2,349 Created claim: summary (P836): The object of the project will be the purchase of equipment and equipment for the Oder. Inside (the equipment is enclosed. EUR 5). 8 rooms will have access to their own bathroom, the remaining 5 rooms will have access to four bathrooms. 2 one-person rooms will be able to perform the function of Isolatex, and will be located on the 1-3 floor, as the two sections so far have been on the 3th and 2th floor. The construction works will be carried out...

24 February 2020

18 February 2020

31 January 2020

14 January 2020