Revision history of "Science through experiment – retrofitting the interschool laboratory of the Experimental Laboratory in Nysa High School No. 2." (Q115464)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:5016:50, 2 March 2023DG Regio talk contribs 87,370 bytes +10,403 Changed label, description and/or aliases in it, da, lv, bg, sk, pt, ro, et, fr, hr, cs, hu, lt, es, sv, de, nl, ga, sl, el, mt, fi, and other parts

25 October 2022

22 October 2022

27 September 2022

2 July 2022

  • curprev 16:3516:35, 2 July 2022DG Regio talk contribs 75,315 bytes +44,396 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 18,024 bytes +3,189 Created claim: summary (P836): La mise en œuvre du projet (01.05.2017-29.04.2019) consistera à moderniser le laboratoire interscolaire de ce laboratoire expérimental (MPPE) à Gim.Nr. 2, à partir du 1.09.2017 SP NR10 à Nysa (ul.Prusa14), qui est l’organisation provinciale Gm.N. sera GZO à Nysa.Après l’achèvement du projet, l’infrastructure sera gérée par son propriétaire SP 10 à Nysa. Le studio modernisé vise à créer les conditions d’apprentissage par le biais d’expériences me...
  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 14,835 bytes +198 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:3817:38, 20 October 2020DG Regio talk contribs 15,076 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3817:38, 20 October 2020DG Regio talk contribs 14,888 bytes −188 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3817:38, 20 October 2020DG Regio talk contribs 15,076 bytes +2,251 Created claim: summary (P836): Implementation of the project (01.05.2017-29.04.2019) will consist of retrofitting the inter-school Laboratory of the Experimental Plant (MPPE) at Gim.No 2, from 1.09.2017 SP NR10 in Nysa (ul.Prusa14), which is being managed by Gm.N.N.The project will be managed by the owner of SP 10 in Nysa.After completion of the project.proj.infrastructure will be managed by the owner SP 10 in Nysa. The equipped workshop is designed to create the conditions f...
  • curprev 17:3817:38, 20 October 2020DG Regio talk contribs 12,825 bytes −1,639 Removed claim: summary (P836): Implementation of the Proj. (01.05.2017-29.04.2019) will be to retrofit the AWD at Gim.No. 2, from 1.09.2017 SP NR10 in Nysa (ul.Prusa14), which is the G.m..N.N. is the GZO in Nysie.At the end of the project, the owner of SP 10 in Nysa will manage the infrastructure. The equipment is designed to create the conditions for school to be taught by the GN (an agreement concluded between them) by: knowledge of the acquisition of qualifications and o...

25 September 2020

24 September 2020

17 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2908:29, 10 March 2020DG Regio talk contribs 12,756 bytes +1,639 Created claim: summary (P836): Implementation of the Proj. (01.05.2017-29.04.2019) will be to retrofit the AWD at Gim.No. 2, from 1.09.2017 SP NR10 in Nysa (ul.Prusa14), which is the G.m..N.N. is the GZO in Nysie.At the end of the project, the owner of SP 10 in Nysa will manage the infrastructure. The equipment is designed to create the conditions for school to be taught by the GN (an agreement concluded between them) by: knowledge of the acquisition of qualifications and of...

24 February 2020

18 February 2020

31 January 2020

14 January 2020