Revision history of "Reconstruction of the Voivodeship Road No. 451 on the section from km 26 + 980 to km 28+ 000 in m. Namysłów with reconstruction of exits to economic zones" (Q115080)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 73,600 bytes +9 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 73,591 bytes +4 Set a claim value: summary (P836): O investimento em questão situa-se no distrito de Namysłów. Inclui a reconstrução da Estrada do Voivodato n.o 451, com um comprimento de 1,02 km, do km 26 + 980 ao km 28 + 000. Como parte do projeto, será realizada a construção de uma nova saída para a zona económica e a construção de correias de fuga da estrada do voivodato. Entre outras coisas, estão previstas obras para incluir a demolição do pavimento rodoviário existente e a construção de um no...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4119:41, 2 March 2023DG Regio talk contribs 71,190 bytes −492 Changed label, description and/or aliases in it, da, sk, fi, cs, de, ro, bg, el, lv, es, ga, pt, fr, sv, sl, lt, hu, et, mt, hr, nl, and other parts

26 October 2022

23 October 2022

2 July 2022

  • curprev 16:2716:27, 2 July 2022DG Regio talk contribs 69,568 bytes +44,064 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:2320:23, 1 December 2021DG Regio talk contribs 15,561 bytes +2,382 Created claim: summary (P836): L’investissement est situé dans le district de Namysłów, à Namysłów. Il s’agit de la reconstruction de la route provinciale no 451 d’une longueur de 1,02 km du km 26 + 980 au km 28+ 000. Dans le cadre du projet, la construction d’une nouvelle sortie de la zone économique et la construction de bandes à exclure de la route provinciale seront réalisées. Entre autres, il est prévu d’effectuer des travaux de démolition de la surface de la route exist...
  • curprev 20:2320:23, 1 December 2021DG Regio talk contribs 13,179 bytes +226 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:0416:04, 20 October 2020DG Regio talk contribs 13,392 bytes +218 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0416:04, 20 October 2020DG Regio talk contribs 13,174 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0416:04, 20 October 2020DG Regio talk contribs 13,309 bytes +2,217 Created claim: summary (P836): The investment in question is located in the district of Namysłów. It includes the reconstruction of the Voivodeship Road No. 451 with a length of 1.02 km, from km 26 + 980 to km 28+ 000. As part of the project, the construction of a new exit to the economic zone will be carried out and the construction of escape belts from the voivodship road will be carried out. Among other things, works are planned to include demolition of the existing road s...
  • curprev 16:0416:04, 20 October 2020DG Regio talk contribs 11,092 bytes −1,840 Removed claim: summary (P836): The investment in question is located in the region of confusion. Includes the reconstruction of provincial road No 451 with a length of 1.02 km from km 26 + 980 to km 28 + 000. Within the framework of the project, the construction of a new exit to the economic zone and the construction of the exclusion lanes from the provincial road will be carried out. It is intended, inter alia, to carry out the works consisting of the demolition of the exi...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5011:50, 9 March 2020DG Regio talk contribs 11,648 bytes +1,840 Created claim: summary (P836): The investment in question is located in the region of confusion. Includes the reconstruction of provincial road No 451 with a length of 1.02 km from km 26 + 980 to km 28 + 000. Within the framework of the project, the construction of a new exit to the economic zone and the construction of the exclusion lanes from the provincial road will be carried out. It is intended, inter alia, to carry out the works consisting of the demolition of the exist...

24 February 2020

18 February 2020

31 January 2020

14 January 2020