Revision history of "Extension of Voivodeship Road No. 419 in Branice from km 16 + 143.8 to km 13+ 270" (Q115065)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 78,025 bytes +4 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 78,021 bytes +48 Set a claim value: summary (P836): O projeto previsto consistirá na reconstrução do troço existente da estrada provincial n.o 419, juntamente com a infraestrutura que acompanha a cidade de Branice, do km 16 + 143,8 ao km 13 + 270. O investimento está localizado na parte sul do voivodato de Opolskie, no distrito de G3ubczyce, na área edificada. Em resultado da realização do investimento, serão criados efeitos materiais diretos, incluindo: extensão das estradas de voivodato reconstruíd...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4119:41, 2 March 2023DG Regio talk contribs 75,576 bytes −1,370 Changed label, description and/or aliases in lv, it, da, bg, sk, fr, hu, el, es, ro, ga, fi, et, cs, de, pt, sv, hr, sl, lt, nl, mt, and other parts

26 October 2022

23 October 2022

2 July 2022

  • curprev 16:2716:27, 2 July 2022DG Regio talk contribs 74,833 bytes +47,872 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:2220:22, 1 December 2021DG Regio talk contribs 16,117 bytes +2,570 Created claim: summary (P836): Le projet envisagé consistera en la reconstruction du tronçon existant de la route de voïvodie no 419 ainsi que des infrastructures associées à Branice, du km 16+ 143,8 au km 13+ 270. Cet investissement est situé dans la partie sud de la voïvodie d’Opolskie, dans le comté de Łubczyckie, dans la zone bâtie. longueur des routes provinciales reconstruites (2,87 km), nombre de projets visant à améliorer la sécurité des usagers de la route (1 PC). Ce...
  • curprev 20:2220:22, 1 December 2021DG Regio talk contribs 13,547 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 13,842 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 13,700 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 13,842 bytes +2,414 Created claim: summary (P836): The planned project will consist of the reconstruction of the existing section of the provincial road No. 419 together with the infrastructure accompanying the town of Branice from km 16 + 143.8 to km 13 + 270. The investment is located in the southern part of the Opolskie Voivodship, in the G³ubczyce district in the built-up area.As a result of the realisation of the investment, direct material effects will be created, including: length of reco...
  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 11,428 bytes −1,976 Removed claim: summary (P836): The planned project will consist of the upgrading of the existing section of provincial road No 419 with associated infrastructure in Braice from km 16 + 143,8 to km 13 + 270. The investment in question is located in the southern part of the Opolskie region in the capercaillie region in built-up areas. as a result of the investment, direct and tangible effects will be created, including: length of reconstructed regional roads (2.87 km), number...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5011:50, 9 March 2020DG Regio talk contribs 12,120 bytes +1,976 Created claim: summary (P836): The planned project will consist of the upgrading of the existing section of provincial road No 419 with associated infrastructure in Braice from km 16 + 143,8 to km 13 + 270. The investment in question is located in the southern part of the Opolskie region in the capercaillie region in built-up areas. as a result of the investment, direct and tangible effects will be created, including: length of reconstructed regional roads (2.87 km), number o...

24 February 2020

18 February 2020

31 January 2020

14 January 2020