Revision history of "Construction of sanitary sewage system in Branice" (Q115041)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 75,130 bytes −2 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 75,132 bytes +16 Set a claim value: summary (P836): Execução da tarefa designada: A «construção de redes de esgotos sanitários em Branice» consiste na desagregação da rede geral de esgotos existente em redes de esgotos de águas pluviais e redes de esgotos sanitários recém-concebidas, juntamente com ligações. Os atuais coletores gerais de faturação desempenharão o papel de drenagem de águas pluviais. A fim de drenar as águas pluviais e derretidas do sistema de drenagem das águas pluviais diretamente p...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4019:40, 2 March 2023DG Regio talk contribs 72,719 bytes −283 Changed label, description and/or aliases in ro, lv, fr, da, it, et, ga, sk, lt, cs, sv, bg, es, hr, fi, hu, sl, pt, nl, el, mt, and other parts

26 October 2022

23 October 2022

27 July 2022

  • curprev 13:3513:35, 27 July 2022DG Regio talk contribs 70,889 bytes +45,156 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:2320:23, 1 December 2021DG Regio talk contribs 15,669 bytes +2,582 Created claim: summary (P836): Mise en œuvre de la tâche intitulée: «Construction du réseau d’assainissement sanitaire à Branice.» consiste en la division du réseau d’assainissement commun existant en égouts d’eaux pluviales et en l’assainissement sanitaire nouvellement conçu avec raccordement. Les collecteurs collectifs actuels joueront le rôle de drainage des eaux de pluie. Afin de drainer l’eau de pluie et l’eau de fonte du système d’eau de pluie directement vers le récept...
  • curprev 20:2320:23, 1 December 2021DG Regio talk contribs 13,087 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 13,399 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 13,291 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 13,396 bytes +2,263 Created claim: summary (P836): Implementation of the task called: “Construction of sanitary sewerage in Branice” consists of the unbundling of the existing general sewerage system into rainwater sewerage and newly designed sanitary sewerage along with connections. The current general billing collectors will play the role of rainwater drainage. In order to drain rainwater and meltwater from the rainwater drain directly to the receiver -row/without the existing section running...
  • curprev 16:0316:03, 20 October 2020DG Regio talk contribs 11,133 bytes −1,789 Removed claim: summary (P836): Implementation of the mission: ‘Construction of a sewerage system in Branice.’ consists of a division of the existing combined sewage system to the sewerage system and to the newly designed sanitary sewage system with connections. Current combined sewer systems will fulfil the role of storm-water system. In order to drain rainwater and mites out of the rainwater drainage system directly into the receiver -ditch/ignoring the existing stretch ru...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5011:50, 9 March 2020DG Regio talk contribs 11,633 bytes +1,789 Created claim: summary (P836): Implementation of the mission: ‘Construction of a sewerage system in Branice.’ consists of a division of the existing combined sewage system to the sewerage system and to the newly designed sanitary sewage system with connections. Current combined sewer systems will fulfil the role of storm-water system. In order to drain rainwater and mites out of the rainwater drainage system directly into the receiver -ditch/ignoring the existing stretch runn...

24 February 2020

18 February 2020

31 January 2020

14 January 2020