Revision history of "A witness to the multiculturalism of the Opole region. Renovation and maintenance of the interior of the Cathedral Uplifting of the Holy Cross in Opole." (Q115007)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 91,907 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 91,908 bytes +52 Set a claim value: summary (P836): O projeto tem por objeto a realização das obras de conservação e de construção necessárias, incluindo o corpo principal da cátedra. As elevações da Santa Cruz em Opole, ou seja, a nave principal e as naves norte e sul. O objetivo das obras previstas é restaurar o aspeto estético totalmente original do interior da catedral, decifrando o seu caráter gótico original, designado por releitura do interior. Além disso, o projeto prevê uma série de ações de...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4019:40, 2 March 2023DG Regio talk contribs 89,459 bytes −12 Changed label, description and/or aliases in it, da, sk, sv, fi, el, ga, lv, cs, fr, sl, pt, hu, ro, et, es, hr, nl, de, lt, bg, mt, and other parts

26 October 2022

23 October 2022

2 July 2022

  • curprev 16:2616:26, 2 July 2022DG Regio talk contribs 87,357 bytes +56,705 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 17,818 bytes +3,113 Created claim: summary (P836): L’objet du projet est de réaliser les travaux de conservation et de construction nécessaires couvrant le corps principal de la cathédrale. Les élévations de la Sainte Croix à Opole, c’est-à-dire la nef principale et les nefs du nord et du sud. L’objectif des travaux envisagés est de restaurer l’aspect esthétique entièrement original de l’intérieur de la Cathédrale en faisant de son caractère gothique original connu sous le nom de Repréparation i...
  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 14,705 bytes +208 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5415:54, 20 October 2020DG Regio talk contribs 14,936 bytes +212 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5415:54, 20 October 2020DG Regio talk contribs 14,724 bytes −218 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5415:54, 20 October 2020DG Regio talk contribs 14,942 bytes +2,910 Created claim: summary (P836): The subject of the project is to carry out the necessary conservation and construction works including the main body of the Chair. The elevations of the Holy Cross in Opole, i.e. the main nave and the northern and southern naves. The aim of the planned works is to restore the fully original aesthetic appearance of the cathedral’s interior by deciphering its original gothic character, referred to as the re-reading of the interior. In addition, th...
  • curprev 15:5415:54, 20 October 2020DG Regio talk contribs 12,032 bytes −2,332 Removed claim: summary (P836): The project involves carrying out the necessary maintenance works involving the main body of the Cathedral. The increase in the Holy Cross in Opole, i.e. the main, and the northern and southern enlargements. The purpose of the planned works is to re-establish the original appearance of the aesthetic appearance of the interior of the Cathedral by studying the original, gothic nature of the interior, referred to as the interior alteration. In ad...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1708:17, 10 March 2020DG Regio talk contribs 13,080 bytes +2,332 Created claim: summary (P836): The project involves carrying out the necessary maintenance works involving the main body of the Cathedral. The increase in the Holy Cross in Opole, i.e. the main, and the northern and southern enlargements. The purpose of the planned works is to re-establish the original appearance of the aesthetic appearance of the interior of the Cathedral by studying the original, gothic nature of the interior, referred to as the interior alteration. In addi...

24 February 2020

18 February 2020

31 January 2020

14 January 2020