Revision history of "Extension and modernisation of the municipal waste collection point in Gogolina" (Q114980)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4019:40, 2 March 2023DG Regio talk contribs 87,878 bytes +1,037 Changed label, description and/or aliases in da, it, sk, fi, el, lv, fr, pt, hr, sl, et, es, sv, ga, lt, ro, de, mt, hu, nl, bg, cs, and other parts

26 October 2022

23 October 2022

2 July 2022

  • curprev 16:2516:25, 2 July 2022DG Regio talk contribs 84,726 bytes +55,259 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1320:13, 1 December 2021DG Regio talk contribs 17,304 bytes +3,031 Created claim: summary (P836): Le projet comprend l’extension, la modernisation et la modernisation du point de collecte des déchets municipaux (ci-après dénommé «PSZOK») situé à Gogolin, ul. La Ligonia. La requérante est le gestionnaire direct de PSZOK, qui est situé sur les parcelles louées par la requérante no 206/11, 206/12, 206/14. La modernisation nécessite à la fois la surface PSZOK — son durcissement et son étanchéité, l’équipement de l’approvisionnement en eau et du...
  • curprev 20:1320:13, 1 December 2021DG Regio talk contribs 14,273 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5315:53, 20 October 2020DG Regio talk contribs 14,561 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5315:53, 20 October 2020DG Regio talk contribs 14,423 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5315:53, 20 October 2020DG Regio talk contribs 14,560 bytes +2,731 Created claim: summary (P836): The project includes the extension, modernisation and retrofitting of the selective collection point of municipal waste (hereinafter PSZOK) operating in Gogolin, at ul. It’s Ligonia. The applicant is a direct manager of PSZOK, which is located on parcels leased by the Applicant No 206/11, 206/12, 206/14. Modernisation requires both PPSZOK surface – its hardening and sealing, armament with water and sewage network, as well as retrofitting of PSZO...
  • curprev 15:5315:53, 20 October 2020DG Regio talk contribs 11,829 bytes −2,327 Removed claim: summary (P836): The project involves the extension, modernisation and retrofitting of a separate collection point for municipal waste (hereinafter PSZOK) operating in Gogolina, at ul. Ligonia. The applicant is the direct manager of PSZOK, which is located on leased by the Applicant plots No 206/11, 206/12, 206/14. Modernisation requires both the road surface of the PSZOK — its solidification and sealing, its setting up in the water and sewerage networks, as w...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1708:17, 10 March 2020DG Regio talk contribs 12,865 bytes +2,327 Created claim: summary (P836): The project involves the extension, modernisation and retrofitting of a separate collection point for municipal waste (hereinafter PSZOK) operating in Gogolina, at ul. Ligonia. The applicant is the direct manager of PSZOK, which is located on leased by the Applicant plots No 206/11, 206/12, 206/14. Modernisation requires both the road surface of the PSZOK — its solidification and sealing, its setting up in the water and sewerage networks, as wel...

24 February 2020

18 February 2020

31 January 2020

14 January 2020