Revision history of "Reconstruction of the water reservoir and bridge in the Central Park on the side of the street. Piastowska in Brzeg" (Q114946)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:5619:56, 2 March 2023DG Regio talk contribs 89,494 bytes +963 Changed label, description and/or aliases in da, it, lv, sk, cs, bg, el, et, fr, ga, hu, ro, pt, sv, fi, hr, lt, nl, mt, es, de, sl, and other parts

26 October 2022

23 October 2022

27 July 2022

  • curprev 13:3313:33, 27 July 2022DG Regio talk contribs 86,423 bytes +56,434 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 17,478 bytes +3,027 Created claim: summary (P836): La portée du projet comprend: 1. Documentation technique. 2. Étude de faisabilité. 3. Travaux de construction et d’assemblage: —la construction du pont, la modernisation de la tête de sortie, la reconstruction du réservoir d’eau, la reconstruction du fossé de drainage, la reconstruction de la ruelle du parc le long de la douve, la construction du ressort d’entrée. 4. Surveillance des investisseurs. 5. La supervision de l’auteur. 6. Travaux de fi...
  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 14,451 bytes +163 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 14,727 bytes +175 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 14,552 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 14,734 bytes +2,869 Created claim: summary (P836): The scope of the project includes: 1. The technical documentation. 2.Study of feasibility. 3. Construction and assembly works: —construction of bridge, -modernisation of the outlet bridge, – reconstruction of the water reservoir, -reconstruction of drainage ditch, -reconstruction of the park avenue along the moat – construction of the source source. 4. It’s investor supervision. 5. It’s copyright supervision. 6. The finishing work. 7. Promotion...
  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 11,865 bytes −2,308 Removed claim: summary (P836): The scope of the project includes: 1. The technical documentation. 2.Feasibility studies. 3. Construction and assembly works: Construction of the brisket, -modernisation of the exhaust pipe, restoration of the water reservoir, a reconstruction of the drainage ditch and reconstruction of the steam stock along the fop -building, and the building of the source. 4. Investor supervision. 5. Author’s supervision. 6. Finishing works. 7. Promotion of...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1708:17, 10 March 2020DG Regio talk contribs 12,883 bytes +2,308 Created claim: summary (P836): The scope of the project includes: 1. The technical documentation. 2.Feasibility studies. 3. Construction and assembly works: Construction of the brisket, -modernisation of the exhaust pipe, restoration of the water reservoir, a reconstruction of the drainage ditch and reconstruction of the steam stock along the fop -building, and the building of the source. 4. Investor supervision. 5. Author’s supervision. 6. Finishing works. 7. Promotion of th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020