Revision history of "Revaluation of the water reservoir “Squadratówka” and the garden part in the Freedom Park in Brzeg" (Q114935)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 77,199 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:2018:20, 9 October 2024DG Regio talk contribs 77,197 bytes −76 Set a claim value: summary (P836): O objetivo do projeto é proporcionar condições favoráveis para a proteção in situ de espécies ameaçadas através da reconstrução do reservatório de água «Squadratówka» e da reavaliação da parte do jardim no Parque da Liberdade, que consiste na reconstrução dos pavimentos existentes das ruelas do parque, juntamente com a fixação de elementos de pequena arquitetura (paredes, custos de lixo, painéis informativos). O projeto alcançará os seguintes indica...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

23 October 2022

5 September 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0920:09, 1 December 2021DG Regio talk contribs 15,820 bytes +2,465 Created claim: summary (P836): L’objet du projet est d’assurer des conditions favorables à la protection in situ des espèces menacées par la reconstruction du réservoir d’eau «Kwadratówka» et la revitalisation de la partie du jardin du parc de la Liberté, consistant en la reconstruction des surfaces existantes des ruelles du parc ainsi que la mise en place d’éléments de petite architecture (graves, frais d’ordures, tableaux d’information). Le projet permettra d’obtenir les in...
  • curprev 20:0920:09, 1 December 2021DG Regio talk contribs 13,355 bytes +168 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 13,626 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 13,463 bytes −171 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 13,634 bytes +2,311 Created claim: summary (P836): The object of the project is to provide favourable conditions for the protection in situ of endangered species through the reconstruction of the water reservoir “Squadratówka” and the revaluation of the garden part in the Freedom Park, consisting of rebuilding the existing pavements of park alleys together with the setting of elements of small architecture (wallows, costs for garbage, information boards). The project will achieve the following i...
  • curprev 15:5215:52, 20 October 2020DG Regio talk contribs 11,323 bytes −1,919 Removed claim: summary (P836): The project concerns the provision of favourable conservation conditions for the in situ conservation of endangered species through the reconstruction of the ‘Kwarrowówka’ water reservoir and the revalorisation of the garden part in the Freedom Park, which consists of the upgrading of existing areas of steam pipes with the setting up of elements of small architecture (benches, waste costs, information boards). The project will achieve the foll...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1308:13, 10 March 2020DG Regio talk contribs 11,952 bytes +1,919 Created claim: summary (P836): The project concerns the provision of favourable conservation conditions for the in situ conservation of endangered species through the reconstruction of the ‘Kwarrowówka’ water reservoir and the revalorisation of the garden part in the Freedom Park, which consists of the upgrading of existing areas of steam pipes with the setting up of elements of small architecture (benches, waste costs, information boards). The project will achieve the follow...

24 February 2020

18 February 2020

31 January 2020

14 January 2020