Revision history of "Thorough energy modernisation of the Chrobry resort in Pokrzywna" (Q114909)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 64,544 bytes +6 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 64,538 bytes −49 Set a claim value: summary (P836): O projeto consiste na realização de obras de construção e instalação no domínio da modernização térmica profunda do edifício do Chrobry Resort Resort, incluindo, para além de assegurar o isolamento adequado das anteparas opacas, também a modernização dos sistemas de aquecimento central e de água quente. O projeto será complementado pela substituição da fonte de calor de baixa eficiência explorada sob a forma de um conjunto de caldeiras a carvão por...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

23 October 2022

2 July 2022

  • curprev 16:2416:24, 2 July 2022DG Regio talk contribs 58,945 bytes +36,513 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 14,352 bytes +1,980 Created claim: summary (P836): Le projet consiste à réaliser des travaux de construction et d’installation dans le cadre de la thermomodernisation profonde du bâtiment Chrobry Resort, y compris, en plus d’assurer une isolation adéquate des cloisons opaques, la modernisation des installations de chauffage central et d’eau chaude sanitaire. Le projet sera complété par le remplacement d’une source de chaleur à faible rendement sous la forme d’un assemblage de chaudières à charbo...
  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 12,372 bytes +133 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:2415:24, 20 October 2020DG Regio talk contribs 12,678 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2415:24, 20 October 2020DG Regio talk contribs 12,555 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2415:24, 20 October 2020DG Regio talk contribs 12,681 bytes +1,808 Created claim: summary (P836): The project consists of carrying out construction and installation works in the field of deep thermal modernisation of the building of the Chrobry Resort Resort, including, in addition to ensuring adequate isolation of opaque bulkheads, also modernisation of central heating and hot water systems. The project will be complemented by the replacement of the low-efficiency source of heat exploited in the form of a coal boiler assembly with a combina...
  • curprev 15:2415:24, 20 October 2020DG Regio talk contribs 10,873 bytes −1,312 Removed claim: summary (P836): The project involves construction and installation works for deep thermal renovation of the Cherry Centre building, which includes, in addition to ensuring adequate insulation of baffles, the modernisation of the central heating and domestic hot water installations. The project will be supplemented by the replacement of an exploited heat source with a low efficiency as a combination of coal-fired boilers for a plant of modern biomass combustio...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1308:13, 10 March 2020DG Regio talk contribs 10,901 bytes +1,312 Created claim: summary (P836): The project involves construction and installation works for deep thermal renovation of the Cherry Centre building, which includes, in addition to ensuring adequate insulation of baffles, the modernisation of the central heating and domestic hot water installations. The project will be supplemented by the replacement of an exploited heat source with a low efficiency as a combination of coal-fired boilers for a plant of modern biomass combustion...

24 February 2020

18 February 2020

31 January 2020

14 January 2020