Revision history of "Thermal modernisation of the former laundry building together with the change of use to the administration building for the Opole Rehabilitation Centre in Korfantów Sp z o.o." (Q114864)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 72,447 bytes +28 Changed label, description and/or aliases in pt
  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 72,419 bytes +83 Set a claim value: summary (P836): O projeto inclui trabalhos de adaptação e adaptação térmica no antigo edifício de lavandaria, substituição de janelas e escárnio, aquecimento de tetos e paredes, substituição do aquecimento central e regulação, bem como substituição da iluminação para eficiência energética. Em resultado do projeto – o início das obras de adaptação térmica será poupado 105620,00 kWh/ano de energia primária e 117,56 kWh/ano de energia final. (diminuição da procura fin...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4019:40, 2 March 2023DG Regio talk contribs 69,939 bytes −1,195 Changed label, description and/or aliases in lv, it, da, sk, fi, et, hr, sv, de, fr, sl, pt, bg, cs, ro, el, nl, ga, hu, mt, es, lt, and other parts

26 October 2022

23 October 2022

2 July 2022

  • curprev 16:2316:23, 2 July 2022DG Regio talk contribs 69,029 bytes +43,972 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0820:08, 1 December 2021DG Regio talk contribs 15,426 bytes +2,297 Created claim: summary (P836): Dans le cadre du projet, des travaux de thermomodernisation et d’adaptation sont prévus dans l’ancien bâtiment de blanchisserie, le remplacement des fenêtres et des bois, le réchauffement des planchers et des murs, le remplacement des installations de chauffage central par réglage, ainsi que le remplacement de l’éclairage par des économies d’énergie. Le projet permettra d’économiser 105 620,00 kWh/an d’énergie primaire et 117,56 kWh/an d’énergie...
  • curprev 20:0820:08, 1 December 2021DG Regio talk contribs 13,129 bytes +239 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 15:2315:23, 20 October 2020DG Regio talk contribs 13,329 bytes +235 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2315:23, 20 October 2020DG Regio talk contribs 13,094 bytes −210 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2315:23, 20 October 2020DG Regio talk contribs 13,304 bytes +2,089 Created claim: summary (P836): The project includes thermal retrofitting and adaptation work in the former laundry building, replacement of windows and mockery, warming of ceilings and walls, replacement of central heating and regulation, as well as replacement of lighting for energy efficient. As a result of the project – the start of thermal retrofitting works will be saved 105620.00 kWh/year of primary energy and 117.56 kWh/year of final energy. (decrease final energy dema...
  • curprev 15:2315:23, 20 October 2020DG Regio talk contribs 11,215 bytes −1,661 Removed claim: summary (P836): As part of the project, thermal modernisation and adaptation work is planned in the former laundry building, replacement of windows and dagi, insulation of the wall and walls, replacement of a c.o system with regulation and replacement of lighting with energy efficient lighting. As a result of the project, the renovation works will save 105 620.00 kWh/year of primary energy and 117.56 kWh/year of final energy. (reduction of final energy demand...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1208:12, 10 March 2020DG Regio talk contribs 11,593 bytes +1,661 Created claim: summary (P836): As part of the project, thermal modernisation and adaptation work is planned in the former laundry building, replacement of windows and dagi, insulation of the wall and walls, replacement of a c.o system with regulation and replacement of lighting with energy efficient lighting. As a result of the project, the renovation works will save 105 620.00 kWh/year of primary energy and 117.56 kWh/year of final energy. (reduction of final energy demand b...

24 February 2020

18 February 2020

31 January 2020

14 January 2020