Revision history of "Activities of the Intermediary Institution (WUP) in the implementation of WM 2014-2020 ROPs in the years 2019-2020 – Technical Assistance" (Q114536)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 50,513 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 50,513 bytes −5 Set a claim value: summary (P836): Prestar um apoio eficaz na execução da OPR da CM pelo Gabinete Provincial do Trabalho de Cracóvia enquanto Instituição Intermediária para o Eixo Prioritário 13, Ação 13.1 através, nomeadamente: — assegurar uma capacidade institucional adequada (por exemplo: salários do pessoal, equipamento dos postos de trabalho, formação, custos das instituições) e – assegurar o processo adequado de seleção, controlo, acompanhamento e informação dos projetos.

12 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3919:39, 2 March 2023DG Regio talk contribs 48,119 bytes −148 Changed label, description and/or aliases in lv, da, sk, it, et, ro, fi, hu, sv, hr, cs, el, de, pt, fr, bg, lt, es, nl, ga, mt, sl, and other parts

26 October 2022

22 October 2022

27 July 2022

  • curprev 13:2613:26, 27 July 2022DG Regio talk contribs 46,176 bytes +27,595 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 12,639 bytes +1,300 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre du ROP MP par le Bureau du travail de la voïvodie de Cracovie en tant qu’organe intermédiaire pour l’axe prioritaire 13, mesure 13.1 à travers, entre autres: — assurer une capacité institutionnelle adéquate (p. ex.: rémunération du personnel, équipement des postes de travail, formation, coûts de l’institution) et — assurer le bon processus de sélection, de contrôle, de suivi et d’information des pro...
  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 11,339 bytes +218 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2112:21, 20 October 2020DG Regio talk contribs 11,562 bytes +201 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2112:21, 20 October 2020DG Regio talk contribs 11,361 bytes −193 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2112:21, 20 October 2020DG Regio talk contribs 11,554 bytes +1,238 Created claim: summary (P836): Providing effective support in the implementation of RPO of WM by the Provincial Labour Office in Krakow as the Intermediate Institution for Priority Axis 13, Action 13.1 through, among others: — ensuring adequate institutional capacity (e.g.: salaries of staff, equipment of workstations, training, costs of institutions) and – ensure the proper process of project selection, control, monitoring and information., translated_summary
  • curprev 12:2112:21, 20 October 2020DG Regio talk contribs 10,316 bytes −817 Removed claim: summary (P836): Ensuring effective support for the implementation of the ROP MP by the Regional Labour Office in Cracow as the intermediate body for Priority Axis 13, Measure 13.1, by, inter alia: — ensuring an adequate institutional capacity (inter alia: the remuneration of staff, the provision of work stations, training, the cost of the institution) and, to ensure an appropriate process for the selection of projects, checks, monitoring and information., rem...

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5311:53, 9 March 2020DG Regio talk contribs 9,839 bytes +817 Created claim: summary (P836): Ensuring effective support for the implementation of the ROP MP by the Regional Labour Office in Cracow as the intermediate body for Priority Axis 13, Measure 13.1, by, inter alia: — ensuring an adequate institutional capacity (inter alia: the remuneration of staff, the provision of work stations, training, the cost of the institution) and, to ensure an appropriate process for the selection of projects, checks, monitoring and information., Addin...

24 February 2020

18 February 2020

31 January 2020

14 January 2020