Revision history of "Development of the basis of psychiatric treatment through the modernisation of the facilities of the Dr. Józef Babiński Clinical Hospital ZOZ in Krakow – stage II" (Q114499)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 64,846 bytes −3 Changed label, description and/or aliases in pt
  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 64,849 bytes +21 Set a claim value: summary (P836): O projeto consiste na modernização e reconstrução de três instalações hospitalares. Edifício n.o 1 parcialmente utilizado com uma área útil de 1816,60 m2, edifício n.o 40 atualmente excluído de funcionamento com uma área útil de 321,70 m2 e edifício 5A atualmente excluído de funcionamento com uma área útil de 944,40 m2. Edifícios inscritos no registo dos monumentos A893, de 17.9.1991. No âmbito do projeto, planeamos atividades de reorganização para...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3919:39, 2 March 2023DG Regio talk contribs 61,654 bytes −501 Changed label, description and/or aliases in lv, da, sk, it, cs, ga, fi, ro, et, lt, hr, sv, fr, nl, pt, bg, de, mt, sl, el, hu, and other parts

26 October 2022

22 October 2022

27 July 2022

  • curprev 13:2513:25, 27 July 2022DG Regio talk contribs 60,057 bytes +37,622 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:4519:45, 1 December 2021DG Regio talk contribs 14,276 bytes +1,852 Created claim: summary (P836): Le projet consiste en la modernisation et la reconstruction de trois établissements hospitaliers. Bâtiment no 1 d’une surface utilisable de 1 816,60 m², bâtiment no 40 actuellement hors service avec une surface utilisable de 321,70 m² et bâtiment n°5A actuellement hors service avec une surface utilisable de 944,40 m². Bâtiments inscrits au registre des monuments A893 du 17.09.1991. Dans le cadre du projet, nous planifions des activités de réorga...
  • curprev 19:4519:45, 1 December 2021DG Regio talk contribs 12,424 bytes +229 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 12,636 bytes +228 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 12,408 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 12,600 bytes +1,725 Created claim: summary (P836): The project consists of the modernisation and reconstruction of three hospital facilities. Building No. 1 partially used with a usable area of 1816.60 m², building No. 40 currently excluded from operation with a usable area of 321,70 m² and building 5A currently excluded from operation with a usable area of 944.40 m². Buildings entered in the register of monuments A893 dated 17.09.1991. As part of the project, we plan reorganisation activities t...
  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 10,875 bytes −1,326 Removed claim: summary (P836): The project consists of the modernisation and upgrading of three hospital facilities. Building 1 partially used with a usable area of 1 816.60 m², Building No 40 currently excluded from operation with the usable area of 321.70 m², and building No 5A currently excluded from operation with a usable area of 944.40 m². Buildings listed in the A893 Register of Monuments of 17.09.1991. As part of the project we are planning reorganisation measures t...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5111:51, 9 March 2020DG Regio talk contribs 10,916 bytes +1,326 Created claim: summary (P836): The project consists of the modernisation and upgrading of three hospital facilities. Building 1 partially used with a usable area of 1 816.60 m², Building No 40 currently excluded from operation with the usable area of 321.70 m², and building No 5A currently excluded from operation with a usable area of 944.40 m². Buildings listed in the A893 Register of Monuments of 17.09.1991. As part of the project we are planning reorganisation measures to...

24 February 2020

18 February 2020

31 January 2020

14 January 2020