Revision history of "Comprehensive development of schools and preschool establishments in Biecz commune with adaptation to the requirements of education reform – in Strzeszyn" (Q114473)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:2215:22, 7 October 2024DG Regio talk contribs 83,027 bytes −27 Changed label, description and/or aliases in pt
  • curprev 15:2215:22, 7 October 2024DG Regio talk contribs 83,054 bytes +22 Set a claim value: summary (P836): Extensão do edifício da escola.A nova parte do edifício será uma parte do piso térreo do edifício com um terraço utilitário acima do todo.No piso térreo haverá duas salas para dois departamentos de jardim de infância ligados à parte existente do edifício onde as instalações do jardim de infância foram projetadas. Na parte da adega haverá um armazém de combustível para a sala de caldeiras do edifício.O acesso ao terraço será fornecido por escadas ext...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3919:39, 2 March 2023DG Regio talk contribs 80,635 bytes +1,697 Changed label, description and/or aliases in da, it, es, sk, lt, sv, cs, bg, fi, de, ga, hr, el, lv, et, ro, pt, fr, hu, nl, sl, mt, and other parts

26 October 2022

22 October 2022

2 July 2022

  • curprev 16:1516:15, 2 July 2022DG Regio talk contribs 76,825 bytes +48,899 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:4819:48, 1 December 2021DG Regio talk contribs 16,649 bytes +2,775 Created claim: summary (P836): Extension du bâtiment de l’école.La nouvelle partie du bâtiment sera un segment de rez-de-chaussée partiellement sous-sol avec une terrasse utilitaire au-dessus de l’ensemble.Au rez-de-chaussée, il y aura deux chambres pour deux unités maternelles reliées à la partie existante du bâtiment où les installations de la maternelle ont été conçues. Au sous-sol, il y aura un magasin de carburant pour la chaufferie du bâtiment. L’accès à la terrasse ser...
  • curprev 19:4819:48, 1 December 2021DG Regio talk contribs 13,874 bytes +238 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 14,077 bytes +217 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 13,860 bytes −224 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 14,084 bytes +2,478 Created claim: summary (P836): Extension of the school building.The new part of the building will be a ground floor part of the building with a utility terrace above the whole.On the ground floor there will be two rooms for two kindergarten departments connected with the existing part of the building where the facilities of the kindergarten were designed. In the cellar part there will be a fuel warehouse for the boiler room of the building.Access to the terrace will be provid...
  • curprev 11:4111:41, 20 October 2020DG Regio talk contribs 11,606 bytes −1,700 Removed claim: summary (P836): The extension of the school building will be a part of the floor segment in part with a commercial terrace over the whole. on the ground floor there will be two rooms for the two pre-school sites connected to the existing part of the building where the nursery facilities have been designed. Part of the podpiwek will be located for the boiler room. access to the terrace will provide an external staircase of the bay. Access to the newly construc...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5111:51, 9 March 2020DG Regio talk contribs 12,016 bytes +1,700 Created claim: summary (P836): The extension of the school building will be a part of the floor segment in part with a commercial terrace over the whole. on the ground floor there will be two rooms for the two pre-school sites connected to the existing part of the building where the nursery facilities have been designed. Part of the podpiwek will be located for the boiler room. access to the terrace will provide an external staircase of the bay. Access to the newly constructe...

24 February 2020

18 February 2020

31 January 2020

14 January 2020