Revision history of "Revitalisation of the spa area of the centre of Muszyna" (Q114459)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:2215:22, 7 October 2024DG Regio talk contribs 84,902 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:2215:22, 7 October 2024DG Regio talk contribs 84,905 bytes −71 Set a claim value: summary (P836): O projeto será executado através de: 1 elaboração da documentação necessária, incluindo o Programa de Revitalização, documentação técnica, entre outros, projeto de construção e análise económica e financeira, 2 reconstrução da superfície da laje do mercado, restauro de caves com função cultural Câmara Municipal, incluindo o desenvolvimento de instalações que desempenhem funções museológicas, ponto de recolha de água mineral, salão de casamento estil...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3919:39, 2 March 2023DG Regio talk contribs 82,579 bytes +1,260 Changed label, description and/or aliases in sk, da, it, sv, el, fi, et, cs, fr, ga, bg, lv, hu, ro, pt, lt, hr, de, es, mt, nl, sl, and other parts

26 October 2022

24 October 2022

2 July 2022

  • curprev 16:1516:15, 2 July 2022DG Regio talk contribs 79,202 bytes +50,656 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:4819:48, 1 December 2021DG Regio talk contribs 16,680 bytes +2,935 Created claim: summary (P836): Le projet sera mis en œuvre: 1 la préparation de la documentation nécessaire, y compris le programme de revitalisation, la documentation technique, entre autres, le projet de construction et l’analyse financière et économique, 2 la reconstruction de la surface de la plaque de marché, la restauration du sous-sol ainsi que la construction d’un bâtiment ayant une fonction culturelle de la mairie, y compris, entre autres, le développement de locaux...
  • curprev 19:4819:48, 1 December 2021DG Regio talk contribs 13,745 bytes +114 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:4011:40, 20 October 2020DG Regio talk contribs 14,072 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4011:40, 20 October 2020DG Regio talk contribs 13,956 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4011:40, 20 October 2020DG Regio talk contribs 14,065 bytes +2,598 Created claim: summary (P836): The project will be implemented by: 1 elaboration of necessary documentation including the Revitalisation Programme, technical documentation, among others, construction project and financial and economic analysis, 2 reconstruction of the surface of the market slab, restoration of cellars with a cultural function City Hall, including the development of premises performing museum functions, mineral water collection point, stylised wedding hall, da...
  • curprev 11:4011:40, 20 October 2020DG Regio talk contribs 11,467 bytes −2,186 Removed claim: summary (P836): The project will be carried out in the following ways: 1 development of the necessary documentation, including the Rehabilitation Programme, technical documentation including construction and financial and economic analysis, 2 upgrading of the surface of the market plate, restoration of the basement with the installation of the cultural heritage object, including the development of museum premises, mineral water abstraction point, stylised roo...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5111:51, 9 March 2020DG Regio talk contribs 12,369 bytes +2,186 Created claim: summary (P836): The project will be carried out in the following ways: 1 development of the necessary documentation, including the Rehabilitation Programme, technical documentation including construction and financial and economic analysis, 2 upgrading of the surface of the market plate, restoration of the basement with the installation of the cultural heritage object, including the development of museum premises, mineral water abstraction point, stylised room...

24 February 2020

18 February 2020

31 January 2020

14 January 2020