Revision history of "Revitalisation of socio-cultural objects and public spaces in Szczurowa commune" (Q114442)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1506:15, 9 October 2024DG Regio talk contribs 90,534 bytes −11 Changed label, description and/or aliases in pt
  • curprev 06:1506:15, 9 October 2024DG Regio talk contribs 90,545 bytes +47 Set a claim value: summary (P836): A execução do investimento consiste na realização de obras de renovação em edifícios de utilidade pública, ou seja, edifícios da OSP e casas populares destinadas às necessidades da comunidade local e à revitalização do espaço público no Solny Uci e no Parque em Strzelce Wielkie. O projecto abrange: 1. Renovação do quartel de bombeiros da OSP em Solny Uci Remodelação da sala de reuniões e das instalações sociais: cozinha e instalações sanitárias, aqu...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3919:39, 2 March 2023DG Regio talk contribs 88,101 bytes −641 Changed label, description and/or aliases in it, lv, da, sk, el, sv, et, pt, fr, fi, cs, hr, ga, de, hu, mt, lt, ro, es, bg, sl, nl, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 16:1416:14, 2 July 2022DG Regio talk contribs 86,637 bytes +56,139 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:4519:45, 1 December 2021DG Regio talk contribs 17,599 bytes +3,201 Created claim: summary (P836): La mise en œuvre de l’investissement consiste en l’exécution de travaux de rénovation dans les services publics, c’est-à-dire les casernes de pompiers des GRT et les maisons populaires dédiées aux besoins de la communauté locale et la revitalisation de l’espace public dans la Solne Uściu et le parc de Strzelce Wielkie. Le projet couvre: 1. Rénovation de la caserne de pompiers du GRT à Uściu Solny, rénovation de la salle de réunion et des install...
  • curprev 19:4519:45, 1 December 2021DG Regio talk contribs 14,398 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:3511:35, 20 October 2020DG Regio talk contribs 14,672 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3511:35, 20 October 2020DG Regio talk contribs 14,532 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3511:35, 20 October 2020DG Regio talk contribs 14,672 bytes +2,916 Created claim: summary (P836): The implementation of the investment consists of carrying out renovation works in public utility buildings, i.e. buildings of the OSP and folk houses intended for the needs of the local community and revitalisation of public space in the Solny Uci and Park in Strzelce Wielkie. The project covers:1. Renovation of the OSP firehouse in the Solny Uci Refurbishment of the meeting room and social facilities: kitchen and sanitary facilities, purchase o...
  • curprev 11:3511:35, 20 October 2020DG Regio talk contribs 11,756 bytes −2,535 Removed claim: summary (P836): The realisation of the investment consists of the completion of the renovation works of the public utility facilities, i.e. the TSOs’ residencies for the needs of the local population and the revitalisation of the public space in the village wall and the park in the Great Basin. The draft terms of reference are: 1. Renovation of the TSO’s reconstruction of the meeting room and social facilities in the Uwall: food and sanitation, purchase of eq...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:5111:51, 9 March 2020DG Regio talk contribs 13,008 bytes +2,535 Created claim: summary (P836): The realisation of the investment consists of the completion of the renovation works of the public utility facilities, i.e. the TSOs’ residencies for the needs of the local population and the revitalisation of the public space in the village wall and the park in the Great Basin. The draft terms of reference are: 1. Renovation of the TSO’s reconstruction of the meeting room and social facilities in the Uwall: food and sanitation, purchase of equi...

24 February 2020

18 February 2020

31 January 2020

14 January 2020