Revision history of "Modernising the recreational and motor infrastructure of MOSiR and adapting it to the needs of people with disabilities and seniors" (Q114395)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 62,230 bytes −5 Changed label, description and/or aliases in pt
  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 62,235 bytes −47 Set a claim value: summary (P836): O objeto do projeto será a ampliação e modernização da infraestrutura existente do Centro Municipal de Desporto e Recreação de Bukowno para idosos e deficientes.No âmbito do projeto, o edifício do átrio sofrerá uma profunda modernização térmica que consistirá em escavar e aquecer as paredes de fundação, aquecer as paredes externas, substituir a carpintaria externa, substituir o sistema, utilizando FER. Modernização do átrio de entrada com modernizaç...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 16:1316:13, 2 July 2022DG Regio talk contribs 57,313 bytes +35,468 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:4619:46, 1 December 2021DG Regio talk contribs 14,005 bytes +1,808 Created claim: summary (P836): Le projet portera sur l’extension et la modernisation de l’infrastructure existante du Centre Municipal de Sports et de Loisirs de Bukowno pour les personnes âgées et les personnes handicapées. Dans le cadre du projet, la salle sera soumise à une thermomodernisation profonde consistant à excaver et réchauffer les murs de fondation, à réchauffer les murs extérieurs, à remplacer la menuiserie extérieure, à remplacer le co-système par l’application...
  • curprev 19:4619:46, 1 December 2021DG Regio talk contribs 12,197 bytes +221 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:3411:34, 20 October 2020DG Regio talk contribs 12,417 bytes +193 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3411:34, 20 October 2020DG Regio talk contribs 12,224 bytes −193 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3411:34, 20 October 2020DG Regio talk contribs 12,417 bytes +1,689 Created claim: summary (P836): The subject of the project will be the extension and modernisation of the existing infrastructure of the Municipal Sports and Recreation Centre in Bukowno for the elderly and the disabled.As part of the project, the hall building will undergo a deep thermal modernisation consisting of excavating and warming the foundation walls, warming up the external walls, replacing the external carpentry, replacing the system, using RES. Modernisation of the...
  • curprev 11:3411:34, 20 October 2020DG Regio talk contribs 10,728 bytes −1,001 Removed claim: summary (P836): The project will expand and modernise the existing infrastructure of the Municipal Sports and Recreation Centre in Bukowno for the elderly and the disabled. The refurbishment of the entrance hall, together with the upgrading of stairs and replacement of the floor of the sports hall. Reconstruction of the basement of the sports hall and adapt them to the function of a wellness and mobility centre. Construction of a glider shaft and installation...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4311:43, 9 March 2020DG Regio talk contribs 10,437 bytes +1,001 Created claim: summary (P836): The project will expand and modernise the existing infrastructure of the Municipal Sports and Recreation Centre in Bukowno for the elderly and the disabled. The refurbishment of the entrance hall, together with the upgrading of stairs and replacement of the floor of the sports hall. Reconstruction of the basement of the sports hall and adapt them to the function of a wellness and mobility centre. Construction of a glider shaft and installation o...

24 February 2020

18 February 2020

31 January 2020

14 January 2020