Revision history of "Establishment of a back-up facility – a public transport centre in Brzeźnica through the reconstruction of the infrastructure for the service of travellers" (Q113038)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 93,344 bytes +7 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 93,337 bytes −48 Set a claim value: summary (P836): O projeto consiste na reconstrução da estação ferroviária histórica de Brzeźnica, que se encontra em ruínas, e no desenvolvimento de zonas adjacentes ao centro de transportes públicos. As atividades abrangidas pelo projeto não dizem respeito a obras de reparação nem à manutenção desta infraestrutura. Isso criará a possibilidade de lidar com os viajantes, incluindo a mudança de transporte individual para transporte público. As instalações criadas no...

7 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 90,988 bytes +1,430 Changed label, description and/or aliases in lv, it, sk, da, et, fi, ro, cs, de, pt, hr, sv, el, fr, bg, lt, hu, es, mt, sl, nl, ga, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4715:47, 2 July 2022DG Regio talk contribs 87,444 bytes +56,995 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 17,678 bytes +3,135 Created claim: summary (P836): Le projet consiste en la reconstruction de la gare historique de Brzeźnica, en ruines, et par le développement de zones adjacentes au centre des transports publics, les activités couvertes par le projet ne concernent pas les travaux de rénovation et ne concerneront pas l’entretien de ces infrastructures. Cela offrira la possibilité de desservir les voyageurs, y compris le passage des transports individuels aux transports publics. Les installatio...
  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 14,543 bytes +213 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:0012:00, 20 October 2020DG Regio talk contribs 14,771 bytes +220 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0012:00, 20 October 2020DG Regio talk contribs 14,551 bytes −210 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0012:00, 20 October 2020DG Regio talk contribs 14,761 bytes +2,853 Created claim: summary (P836): The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as par...
  • curprev 12:0012:00, 20 October 2020DG Regio talk contribs 11,908 bytes −2,250 Removed claim: summary (P836): The aim of the project is to rebuild the heritage, which is in ruins, in the case of a railway service in a butcher and a site adjacent to the communication centre of the public transport operation, which are not covered by the works, and will not concern the maintenance of the infrastructure. This will provide the possibility to service travellers, including transfers of personal communications, to a means of collective communication. The sit...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2108:21, 10 March 2020DG Regio talk contribs 12,874 bytes +2,250 Created claim: summary (P836): The aim of the project is to rebuild the heritage, which is in ruins, in the case of a railway service in a butcher and a site adjacent to the communication centre of the public transport operation, which are not covered by the works, and will not concern the maintenance of the infrastructure. This will provide the possibility to service travellers, including transfers of personal communications, to a means of collective communication. The sites...

24 February 2020

18 February 2020

31 January 2020

14 January 2020