Revision history of "Reconstruction and Construction of Railway Stations of the Poprad Valley Stage II" (Q113032)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 89,684 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 89,685 bytes −780 Set a claim value: summary (P836): Este projeto pressupõe que, nas estações ferroviárias de Wierchomla Wielka, Żegiestów, ŻegiestówZdrój, o projeto irá reconstruir edifícios existentes juntamente com o ordenamento do território. Para a estação de Milik, está prevista a construção de uma nova estação do sistema e, para as estações ferroviárias de Młodów e LomnicaZdrój, está prevista a construção de uma estação estilizada em vez da instalação existente. O projeto inclui 13 tarefas de i...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 88,068 bytes +11,882 Changed label, description and/or aliases in da, it, et, sk, fi, hr, es, lt, hu, ro, ga, fr, pt, lv, sv, bg, nl, el, sl, cs, de, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4715:47, 2 July 2022DG Regio talk contribs 74,069 bytes +44,548 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 16,913 bytes +3,176 Created claim: summary (P836): Le projet suppose que dans les stations Wierchomla Wielka, Žegiestów, ŽegiestówZdrój, le projet reconstruira les bâtiments existants en même temps que l’aménagement du terrain. La construction d’une nouvelle station réseau est prévue pour la station Milik et pour les stations de Młodów et LomnicaZdrój, la construction d’une station stylisée est prévue sur le site de l’installation existante. Le projet prévoit 13 tâches d’investissement: Les trav...
  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 13,737 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 14,032 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 13,890 bytes −191 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 14,081 bytes +2,244 Created claim: summary (P836): This project assumes that at the railway stations Wierchomla Wielka, Żegiestów, ŻegiestówZdrój, the project will reconstruct existing buildings along with land development. For Milik station the construction of a new system station is planned and for the Młodów railway stations and LomnicaZdrój the construction of a stylised station is planned in place of the existing facility.The project includes 13 investment tasks: Design and construction wor...
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 11,837 bytes −2,132 Removed claim: summary (P836): This project assumes that, in the context of the project, it will be possible to rebuild the existing buildings together with the development of the land. The construction of a new system station is foreseen for the Millik Station and for the stations of Young and ŁomnicazZdrój to build a stylised station at the site of the existing pipeline. the project foresees 13 investment tasks: Project and works at the ŁomnicazZdrój station, Project and...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2108:21, 10 March 2020DG Regio talk contribs 12,679 bytes +2,132 Created claim: summary (P836): This project assumes that, in the context of the project, it will be possible to rebuild the existing buildings together with the development of the land. The construction of a new system station is foreseen for the Millik Station and for the stations of Young and ŁomnicazZdrój to build a stylised station at the site of the existing pipeline. the project foresees 13 investment tasks: Project and works at the ŁomnicazZdrój station, Project and wo...

24 February 2020

18 February 2020

31 January 2020

14 January 2020