Revision history of "Reconstruction and construction of Railway Stations of the Poprad Valley Stage I" (Q113031)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 84,556 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 84,557 bytes −643 Set a claim value: summary (P836): O projeto pressupõe que, nas estações ferroviárias de Piwniczna Zdrój, Piwniczna, Stary Sącz, Rytro e Barcice, os edifícios existentes serão reconstruídos juntamente com o ordenamento do território. Para a estação de Zubrzyk, está prevista a construção de uma estação estilizada no local do objeto existente para demolição. O projeto inclui 13 tarefas de investimento: As obras de conceção e construção na estação de Piwniczna Zdrój, as obras de conceçã...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 82,803 bytes +9,817 Changed label, description and/or aliases in da, it, sk, lv, hr, fi, el, fr, ga, sv, et, pt, hu, es, ro, lt, de, nl, bg, sl, cs, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4715:47, 2 July 2022DG Regio talk contribs 70,869 bytes +42,431 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 16,573 bytes +3,081 Created claim: summary (P836): Le projet suppose que dans les stations Piwniczna Zdrój, Piwniczna, Stary Sącz, Rytro et Barcice, les bâtiments existants ainsi que le développement de la zone seront reconstruits. Pour la station Zubrzyk, il est prévu de construire une station stylisée sur le site de l’installation existante pour la démolition.Le projet prévoit 13 tâches d’investissement: Travaux de projet et de construction à la gare de Piwniczna Zdrój, travaux de conception e...
  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 13,492 bytes +136 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 13,797 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 13,656 bytes −131 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 13,787 bytes +2,153 Created claim: summary (P836): The project assumes that at the railway stations Piwniczna Zdrój, Piwniczna, Stary Sącz, Rytro and Barcice the existing buildings will be reconstructed along with land development. For the Zubrzyk station the construction of a stylised station in the place of the existing object for demolition is planned.The project includes 13 investment tasks: The design and construction works at the station Piwniczna Zdrój, Design and construction works at th...
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 11,634 bytes −2,071 Removed claim: summary (P836): The project assumes that, in the stations of Piwniczna Zdrój, Piwne, Stary Sącz, Rytro and Barcice, the renovation of the existing buildings, together with the development of the land, will be carried out. For the Zubrrzyk station, construction of a stylised station at the site of an existing facility is foreseen. the project foresees 13 investment tasks: Project and works at the Piwnniczna station, Project and works at the railway station of...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2108:21, 10 March 2020DG Regio talk contribs 12,415 bytes +2,071 Created claim: summary (P836): The project assumes that, in the stations of Piwniczna Zdrój, Piwne, Stary Sącz, Rytro and Barcice, the renovation of the existing buildings, together with the development of the land, will be carried out. For the Zubrrzyk station, construction of a stylised station at the site of an existing facility is foreseen. the project foresees 13 investment tasks: Project and works at the Piwnniczna station, Project and works at the railway station of Zu...

24 February 2020

18 February 2020

31 January 2020

14 January 2020