Revision history of "“Expansion of the district road No. 1424K Bochnia – Uście Solne – Barczków on the section Bochnia – Bogucice (Stage II Gawłów – Bogucice)”" (Q113023)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

2 July 2022

  • curprev 15:4715:47, 2 July 2022DG Regio talk contribs 89,426 bytes +58,417 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 17,805 bytes +3,279 Created claim: summary (P836): Le projet concerne un investissement routier prévu pour la conception et la construction de formules, en mode ZRID. Dans le cadre de l’investissement, une extension complète du DP no 1424K a été mise en place pour une longueur de 3,344 km 59 769 320 km, comprenant: augmentation de la largeur de la chaussée à la norme de 6 m, correction des arcs horizontaux de la chaussée, augmentation de la capacité de charge à la catégorie du trafic KR3 avec la...
  • curprev 20:1620:16, 1 December 2021DG Regio talk contribs 14,526 bytes +221 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 14,746 bytes +216 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 14,530 bytes −210 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 14,740 bytes +2,871 Created claim: summary (P836): The project concerns road investment planned to be implemented in the design and construction formula, in ZRID mode.As part of the project, a comprehensive extension of DP No.1424K was established for a length of 3.344 km 59769320, consisting of: increase the width of the road to the normative 6 m, adjust the horizontal arches of the roadway, increase the load capacity to the KR3 with an acceptable load on the 115 kN computational axis, work und...
  • curprev 11:5911:59, 20 October 2020DG Regio talk contribs 11,869 bytes −2,324 Removed claim: summary (P836): The project relates to the road investment to be carried out in the design and use of the ZRID.In the framework of the investment project, a comprehensive extension of 1424K 3,344K to km 59769320, consisting of: increasing the width of road to the standard roadway 6 m, the correction of road arcs, the increase of the load capacity to Cat. movement of the KR3 with an acceptable axle load axle load of 115 kN, execution in structural layers of th...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2108:21, 10 March 2020DG Regio talk contribs 12,907 bytes +2,324 Created claim: summary (P836): The project relates to the road investment to be carried out in the design and use of the ZRID.In the framework of the investment project, a comprehensive extension of 1424K 3,344K to km 59769320, consisting of: increasing the width of road to the standard roadway 6 m, the correction of road arcs, the increase of the load capacity to Cat. movement of the KR3 with an acceptable axle load axle load of 115 kN, execution in structural layers of the...

24 February 2020

18 February 2020

31 January 2020

14 January 2020